Talaja - Mahuva NH-8E Highway Expansion
Sector: Commercial • Location: Gujarat, India
Source: World Bank Group
The project envisages four-laning of Talaja-Mahuva section of NH-8E from 53.58 km to 100.10 km in Gujarat.
This road upgradation is promoted by the Joint Venture of MEP Infrastructure Developers and Sanjose India Infrastructure & Construction, holding 60 per cent and 40 per cent, respectively.
The concession was signed in May 2016 following a competitive bidding process with bid criteria being
- Status
- Prospective
- Sector
- Commercial, Road, Government
- Location
- Gujarat, India
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Talaja - Mahuva NH-8E Highway Expansion
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project envisages four-laning of Talaja-Mahuva section of NH-8E from 53.58 km to 100.10 km in Gujarat. This road upgradation is promoted by the Joint Venture of MEP Infrastructure Developers and Sanjose India Infrastructure & Construction, holding 60 per cent and 40 per cent, respectively. The concession was signed in May 2016 following a competitive bidding process with bid criteria being the lowest cost of construction and operation. MEP Sanjose JV appeared to be the lowest bidder in the auction, thus bagging the right to undertake the project. This is a brownfield project being developed under a BROT modality, with a concession period of 15 years, excluding 2.5 years of construction works. This project falls under the new Hybrid Annuity model, which is a mix of engineering, procurement and construction (EPC) and build operate transfer (BOT) system. The project cost (as per concession agreement) is Rs. 643 crore ($ 96.4 million). According to HAM, the project costs would be split between the sponsor as follows: sponsor's equity of $14.46 million (15%), NHAI grant of $38.57 million (40%) and the remaining $43.4 million (45%) would be debt financing arranged by the sponsor. Thereafter, NHAI would repay the 60 per cent private funding in installments, plus interest thereon over the life span of the concession. Financial closure reached on March 13, 2017. https://ijglobal.com/data/transaction/37784/talaja-mahuva-nh-8e-highway-expansion https://ijglobal.com/data/transaction/37784/talaja-mahuva-nh-8e-highway-expansion |
Original sector | Transport |
Procurement method | |
Budget |
Location
Country | India |
State | Gujarat |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Road, Government |
Article published date | 2024-05-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in India
- Mundra Ultra Mega Power Plant Gujarat
- ONGC Tripura Power Plant
- Salaya Power Project Gujarat
- Cable-stayed bridge project in the Chambal River
- Construction services for the wellness center component of NexusPark for the Columbus Regional Health and the City of Columbus in Indiana (United States)
- Mumbra Bypass Project
- Essel Gwalior Shivpuri Toll Roads Private Limited
- Mytrah Energy Limited- 100.3MW Savalsang Windfarm