Talas Water and Wastewater Rehabilitation
Sector: Water Supply and Storage • Location: Kyrgyz Republic
Source: European Bank for Reconstruction and Development (EBRD)
Translated version of this PSD: Russian The EBRD is considering supporting the Talas Water and Wastewater Sub-Project. The EBRD would extend a sovereign loan of up to €2 million to the Kyrgyz Republic, to be on-lent to Talas City for the benefit of the Talas Water Company for improvement of water supply and wastewater services.
The EBRD will also seek an investment grant from an international d
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | repaying |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Translated version of this PSD: Russian The EBRD is considering supporting the Talas Water and Wastewater Sub-Project. The EBRD would extend a sovereign loan of up to €2 million to the Kyrgyz Republic, to be on-lent to Talas City for the benefit of the Talas Water Company for improvement of water supply and wastewater services. The EBRD will also seek an investment grant from an international donor of €3 million to facilitate implementation of the project which will address urgently needed water and wastewater infrastructure rehabilitation needs. This support will be extended under the existing EBRD sovereign framework of up to €20 million, established by the Bank to co-finance with international donors priority water and wastewater rehabilitation sub-projects across the Kyrgyz Republic. The framework envisages sovereign loans that would be on-lent to the cities for the benefit of the water companies involved and would address urgently needed water and wastewater infrastructure rehabilitation needs. The overall objectives of this sub-project are to: (a) rehabilitate the water supply and wastewater system; and (b) improve financial and operational management. Transition Impact of the sub-project would be: Government of the Kyrgyz Republic, with on-lending to Talas City for the benefit of the Talas Water Company. Sovereign loan of up to €2.0 million to the Kyrgyz Republic, on-lent to Talas City for the benefit of the Talas Water Company. The total sub-project cost is €5.9 million including technical cooperation. The sub-project will be co-financed by an investment grant from an international donor. The project has been categorised B in accordance with EBRD’s 2008 Environmental and Social Policy. An Environmental and Social (E&S) Audit/Review of current E&S management practices, operations and facilities, and an Environmental and Social Analysis of the proposed Priority Investment Programme (PIP) is underway as part of the Feasibility Study, by independent consultants. The potential E&S impacts of priority investments in rehabilitation and modernisation of the Company's existing water supply and wastewater services are likely to be site-specific and can be readily identified and addressed through adequate mitigation measures. The initial due diligence results indicate, that the Company’s Environment, Health and Safety management capacity and capabilities are deficient, and that their current occupational health and safety and stakeholder engagement practices require further improvement to meet EBRD's Performance Requirements (PRs). The implementation of the proposed PIP is expected to improve efficiency, reliability and the quality of water supply and wastewater services in Talas, thus contributing to the provision of uninterrupted access to safe drinking water, reducing leakages, preventing ground and watercourse pollution and improving public health. An Environmental and Social Action Plan (ESAP) and a Stakeholder Engagement Plan (SEP) will be developed for the Company. This PSD will be updated upon completion of the due diligence. The following technical co-operation (“TC”) assignments are envisaged as part of this project: |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
