logo
ProjectProject In Construction

Talca - Chillán section of Ruta 5 PPP project

One of 12 projects Taiyo tracks in Maule.

Source: InfraPPPWorld

This project involves the development of the second concession of Route 5 in its Talca – Chillán Section that begins between km 219,49 (sector north of Río Claro) and km 412,80 (a sector south of Chillán Viejo). An approximate projected length is 195 km, and the route includes the Regions of Maule and Ñuble. The scope of work includes the development of dual carriageways, implementation of third t

Status
Under Construction
Sector
Road, Rail, Commercial, Seaport, Mass Transit, Government
Location
Maule, Chile
Updated
22 Jul 2026
Source
InfraPPPWorld

ConstructChat

Ask ConstructChat about Talca - Chillán section of Ruta 5 PPP project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Talca - Chillán section of Ruta 5 PPP project” is an infrastructure initiative in the Road sector, located in Maule, Chile. Taiyo aggregates data on it from InfraPPPWorld.

Participants

Sponsoring Agency

Company

Status

Original status

project in construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project involves the development of the second concession of Route 5 in its Talca – Chillán Section that begins between km 219,49 (sector north of Río Claro) and km 412,80 (a sector south of Chillán Viejo). An approximate projected length is 195 km, and the route includes the Regions of Maule and Ñuble. The scope of work includes the development of dual carriageways, implementation of third tracks, expansion and uniformity of berms, replacement of all road safety and signaling elements of according to current regulations, replacing of old bridges, building service streets, walkways and structures such as bridges, viaducts, railroad crossings, links, returns, crossings.In addition, the project will involve the incorporation of a bypass with an approximate extension of 54 km designed for speed of 120 km/h (bidirectional with two tracks per direction).The project will also will include expansion of third lanes in the sector between San Carlos and Chillán Viejo, rehabilitation of existing roads, rectification of curves and slopes for speed of 120 km/hr with specific exceptions, enabling new bridges, links, walkways, crossings, returns and stretches of service streets and the progressive implementation of a Collection System through electronic toll gates throughout its route.

Original sector

Transport

Procurement method

Budget

Location

Country

Chile

State

Maule

Source

Source

InfraPPPWorld

URL

More Details

Record type

Project

Sector

Road, Rail, Commercial, Seaport, Mass Transit, Government

Article published date

2025-02-24

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project