logo

Talimarjan Power Complex Acquisition

Sector: Power Generation (CCGT) • Location: Uzbekistan

Source: Khaleej Times

Project
Completed

Taqa and Mubadala jointly acquired a 40% stake each in the 875 MW gas-fired Talimarjan Power Complex in Uzbekistan, including a 40% stake in the operations and maintenance entity.

Status
Closed
Sector
Power Generation (CCGT)
Location
Uzbekistan
Updated
22 Jul 2026
Source
Khaleej Times

ConstructChat

Ask ConstructChat about Talimarjan Power Complex Acquisition

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Talimarjan Power Complex Acquisition” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Uzbekistan. Taiyo aggregates data on it from Khaleej Times.

Participants

Not available for this record.

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Taqa and Mubadala jointly acquired a 40% stake each in the 875 MW gas-fired Talimarjan Power Complex in Uzbekistan, including a 40% stake in the operations and maintenance entity.

Original sector

Utilities

Location

Country

Uzbekistan

Source

Source

Khaleej Times

URL

More Details

Record type

Project

Sector

Power Generation (CCGT)

Article published date

2025-11-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project