Talimarjan Power Complex Acquisition
Sector: Power Generation (CCGT) • Location: Uzbekistan
Source: Khaleej Times
Taqa and Mubadala jointly acquired a 40% stake each in the 875 MW gas-fired Talimarjan Power Complex in Uzbekistan, including a 40% stake in the operations and maintenance entity.
- Status
- Closed
- Sector
- Power Generation (CCGT)
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- Khaleej Times
ConstructChat
Ask ConstructChat about Talimarjan Power Complex Acquisition
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Taqa and Mubadala jointly acquired a 40% stake each in the 875 MW gas-fired Talimarjan Power Complex in Uzbekistan, including a 40% stake in the operations and maintenance entity. |
Original sector | Utilities |
Location
Country | Uzbekistan |
Source
Source | Khaleej Times |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT) |
Article published date | 2025-11-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
