logo
ProjectRepaying

Talimarjan Power Project

One of 10,000+ projects Taiyo tracks in Uzbekistan.

Source: European Bank for Reconstruction and Development (EBRD)

The Project is the development and construction of a 900MW Combined-Cycle Gas Turbine (CCGT) Power Plant at the existing gas-fired Talimarjan Power Station in Kashkadarya region of Uzbekistan. The Project will be based within the existing Talimarjan Power Station site and is part of modernization of the Power Generation sector in Uzbekistan. The Project will be co-financed by the Asian Development

Status
Under Construction
Sector
Geothermal, Wind, Residential, Road, Commercial, Power Generation (CCGT), Government
Location
Uzbekistan
Updated
22 Jul 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Talimarjan Power Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Talimarjan Power Project” is an infrastructure initiative in the Geothermal sector, located in Uzbekistan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

repaying

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Project is the development and construction of a 900MW Combined-Cycle Gas Turbine (CCGT) Power Plant at the existing gas-fired Talimarjan Power Station in Kashkadarya region of Uzbekistan. The Project will be based within the existing Talimarjan Power Station site and is part of modernization of the Power Generation sector in Uzbekistan. The Project will be co-financed by the Asian Development Bank (ADB) and Fund for Reconstruction and Development of Uzbekistan, who have financed a CCGT at the site in the past. NTS: English | Russian SEP: English | Russian Final ESAP: English | Russian | Updates October 2018: English | Russian EIA June 2017: English | Russian EIA English June 2017 Appendix EIA English Final report EIA English Final appendix 1 EIA English Final appendix 2 Full ESIA documentation is available locally at: JSC Uzbekenergo Mr. Shukhrat Sheraliyev Deputy Chairman of Board 6 Istiklol Street, Tashkent, 100000, Uzbekistan And Talimarjan (Project) Office Mr. Yusupov A.M. PIU Head Talimarjan Thermal Power Station Nuristan Settlement, Nishan Area, Kashkadarya Region, Uzbekistan Tel. (+998-71)-233-34981690 e-mail: grp_tal_tes@mail.ru And EBRD Resident office Mr. Dilshod Akhundjanov Associate Director, EBRD 1, Qoratosh Street, Tashkent, 100027, Republic of Uzbekistan Telephone: +99871 1404400 And www.uzbekenergo.uz/ru/documents/1623/ Environmental or social enquiries Talimarjan (Project) Office Yusupov A.M. PIU Head Talimarjan Thermal Power Station Nuristan Settlement, Nishan Area, Kashkadarya Region, Uzbekistan Tel. (+998-71)-233-34981690 e-mail: grp_tal_tes@mail.ru

Original sector

Energy

Location

Country

Uzbekistan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Geothermal, Wind, Residential, Road, Commercial, Power Generation (CCGT), Government

Article published date

2025-08-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project