Talimarjan Power Project
One of 10,000+ projects Taiyo tracks in Uzbekistan.
Source: European Bank for Reconstruction and Development (EBRD)
The Project is the development and construction of a 900MW Combined-Cycle Gas Turbine (CCGT) Power Plant at the existing gas-fired Talimarjan Power Station in Kashkadarya region of Uzbekistan. The Project will be based within the existing Talimarjan Power Station site and is part of modernization of the Power Generation sector in Uzbekistan. The Project will be co-financed by the Asian Development
- Status
- Under Construction
- Sector
- Geothermal, Wind, Residential, Road, Commercial, Power Generation (CCGT), Government
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- European Bank for Reconstruction and Development (EBRD)
ConstructChat
Ask ConstructChat about Talimarjan Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | repaying |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project is the development and construction of a 900MW Combined-Cycle Gas Turbine (CCGT) Power Plant at the existing gas-fired Talimarjan Power Station in Kashkadarya region of Uzbekistan. The Project will be based within the existing Talimarjan Power Station site and is part of modernization of the Power Generation sector in Uzbekistan. The Project will be co-financed by the Asian Development Bank (ADB) and Fund for Reconstruction and Development of Uzbekistan, who have financed a CCGT at the site in the past. NTS: English | Russian SEP: English | Russian Final ESAP: English | Russian | Updates October 2018: English | Russian EIA June 2017: English | Russian EIA English June 2017 Appendix EIA English Final report EIA English Final appendix 1 EIA English Final appendix 2 Full ESIA documentation is available locally at: JSC Uzbekenergo Mr. Shukhrat Sheraliyev Deputy Chairman of Board 6 Istiklol Street, Tashkent, 100000, Uzbekistan And Talimarjan (Project) Office Mr. Yusupov A.M. PIU Head Talimarjan Thermal Power Station Nuristan Settlement, Nishan Area, Kashkadarya Region, Uzbekistan Tel. (+998-71)-233-34981690 e-mail: grp_tal_tes@mail.ru And EBRD Resident office Mr. Dilshod Akhundjanov Associate Director, EBRD 1, Qoratosh Street, Tashkent, 100027, Republic of Uzbekistan Telephone: +99871 1404400 And www.uzbekenergo.uz/ru/documents/1623/ Environmental or social enquiries Talimarjan (Project) Office Yusupov A.M. PIU Head Talimarjan Thermal Power Station Nuristan Settlement, Nishan Area, Kashkadarya Region, Uzbekistan Tel. (+998-71)-233-34981690 e-mail: grp_tal_tes@mail.ru |
Original sector | Energy |
Location
Country | Uzbekistan |
Source
Source | European Bank for Reconstruction and Development (EBRD) |
URL |
More Details
Record type | Project |
Sector | Geothermal, Wind, Residential, Road, Commercial, Power Generation (CCGT), Government |
Article published date | 2025-08-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
