logo

Talimarjan Power Project

Sector: Road • Location: Uzbekistan

Source: European Bank for Reconstruction and Development (EBRD)

Project
Repaying

The Project is the development and construction of a 900MW Combined-Cycle Gas Turbine (CCGT) Power Plant at the existing gas-fired Talimarjan Power Station in Kashkadarya region of Uzbekistan. The Project will be based within the existing Talimarjan Power Station site and is part of modernization of the Power Generation sector in Uzbekistan. The Project will be co-financed by the Asian Development

Project Information FAQ

Project Information

4 Q
The project “Talimarjan Power Project” is an infrastructure initiative in the Road sector, located in Uzbekistan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

repaying

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project is the development and construction of a 900MW Combined-Cycle Gas Turbine (CCGT) Power Plant at the existing gas-fired Talimarjan Power Station in Kashkadarya region of Uzbekistan. The Project will be based within the existing Talimarjan Power Station site and is part of modernization of the Power Generation sector in Uzbekistan. The Project will be co-financed by the Asian Development Bank (ADB) and Fund for Reconstruction and Development of Uzbekistan, who have financed a CCGT at the site in the past. NTS: English | Russian SEP: English | Russian Final ESAP: English | Russian | Updates October 2018: English | Russian EIA June 2017: English | Russian EIA English June 2017 Appendix EIA English Final report EIA English Final appendix 1 EIA English Final appendix 2 Full ESIA documentation is available locally at: JSC Uzbekenergo Mr. Shukhrat Sheraliyev Deputy Chairman of Board 6 Istiklol Street, Tashkent, 100000, Uzbekistan And Talimarjan (Project) Office Mr. Yusupov A.M. PIU Head Talimarjan Thermal Power Station Nuristan Settlement, Nishan Area, Kashkadarya Region, Uzbekistan Tel. (+998-71)-233-34981690 e-mail: grp_tal_tes@mail.ru And EBRD Resident office Mr. Dilshod Akhundjanov Associate Director, EBRD 1, Qoratosh Street, Tashkent, 100027, Republic of Uzbekistan Telephone: +99871 1404400 And www.uzbekenergo.uz/ru/documents/1623/ Environmental or social enquiries Talimarjan (Project) Office Yusupov A.M. PIU Head Talimarjan Thermal Power Station Nuristan Settlement, Nishan Area, Kashkadarya Region, Uzbekistan Tel. (+998-71)-233-34981690 e-mail: grp_tal_tes@mail.ru

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data