logo
ProjectClosed

Talimarjan Transmission Project

Sector: Power Transmission • Location: Uzbekistan

Source: World Bank Group

The development objective of the Talimarjan Transmission Project (TPP) is to improve the reliability of the electricity supply to residential and business consumers in South-Western Uzbekistan. There are two components to the project. The first components the project is strengthening power transmission network by construction of: (a) a 500/220 kV new open switchyard at Talimarjan TPP, (b) about 22

Status
Closed
Sector
Power Transmission, Wind, Geothermal, Residential, Government, Power Generation (CCGT)
Location
Uzbekistan
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Talimarjan Transmission Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Talimarjan Transmission Project” is an infrastructure initiative in the Power Transmission sector, located in Uzbekistan. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Talimarjan Transmission Project (TPP) is to improve the reliability of the electricity supply to residential and business consumers in South-Western Uzbekistan. There are two components to the project. The first components the project is strengthening power transmission network by construction of: (a) a 500/220 kV new open switchyard at Talimarjan TPP, (b) about 220 km 500 kV single circuit transmission line from Talimarjan TPP to the Sogdiana substation; c) a connection bay at Sogdiana substation and (d) a 500 kV connection line from the 500/220 kV open switch-yard at Talimarjan thermal power plant to the Karakul-Guzar transmission line. The second components the project is institutional strengthening by providing technical assistance (TA) for: (a) strengthening the Project Implementing Entity's and its subsidiaries' technical and fiduciary capacity; and (b) Strengthening the Project Implementing Entity?s capacity for project management, monitoring, reporting and evaluation, including procurement, financial management and disbursement activities and carrying out the project and the Project Implementing Entity audit.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Uzbekistan

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Transmission, Wind, Geothermal, Residential, Government, Power Generation (CCGT)

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project