Talimarjan Transmission Project
Sector: Power Transmission • Location: Uzbekistan
Source: World Bank Group
The development objective of the Talimarjan Transmission Project (TPP) is to improve the reliability of the electricity supply to residential and business consumers in South-Western Uzbekistan. There are two components to the project. The first components the project is strengthening power transmission network by construction of: (a) a 500/220 kV new open switchyard at Talimarjan TPP, (b) about 22
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The development objective of the Talimarjan Transmission Project (TPP) is to improve the reliability of the electricity supply to residential and business consumers in South-Western Uzbekistan. There are two components to the project. The first components the project is strengthening power transmission network by construction of: (a) a 500/220 kV new open switchyard at Talimarjan TPP, (b) about 220 km 500 kV single circuit transmission line from Talimarjan TPP to the Sogdiana substation; c) a connection bay at Sogdiana substation and (d) a 500 kV connection line from the 500/220 kV open switch-yard at Talimarjan thermal power plant to the Karakul-Guzar transmission line. The second components the project is institutional strengthening by providing technical assistance (TA) for: (a) strengthening the Project Implementing Entity's and its subsidiaries' technical and fiduciary capacity; and (b) Strengthening the Project Implementing Entity?s capacity for project management, monitoring, reporting and evaluation, including procurement, financial management and disbursement activities and carrying out the project and the Project Implementing Entity audit. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Power Transmission projects in Uzbekistan
- South-West Gissar Project
- Jizzakh solar plant
- Tashkent water improvement contract
- Bukhara & Samarkand water supply project
- Samarkand solar plant
- Uzbekistan: Bukhara Region Water Supply and Sewerage (BRWSSP)
- Uzbekistan: Bukhara Region Water Supply and Sewerage (BRWSSP)
- Uzbekistan: Bukhara Region Water Supply and Sewerage (BRWSSP)
