Tall Chief Lift Station Repair
Sector: Water Supply and Storage • Location: Skiatook, Oklahoma, United States of America
Source: Dodge USA
The Contractor shall be responsible for the mobilization of all personnel, materials, services, equipment and supplies necessary to complete the removal and installation of the Tall Chief lift station. Work includes removal of old tank and installation of a new tank, electrical components, and pumps. Contractor shall place new tank, electrical components and pumps to the specification provided. Th
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Skiatook, Oklahoma, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tall Chief Lift Station Repair
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Contractor shall be responsible for the mobilization of all personnel, materials, services, equipment and supplies necessary to complete the removal and installation of the Tall Chief lift station. Work includes removal of old tank and installation of a new tank, electrical components, and pumps. Contractor shall place new tank, electrical components and pumps to the specification provided. The general area shall be cleaned up by removing all materials from work site. After installation i... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oklahoma |
City | Skiatook |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2024-09-23 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
