Tallgrass Trailblazer Carbon Capture Pipeline
Sector: Natural Gas • Location: Nebraska, Iowa, Wyoming, United States
Source: CIProud
A multi-state carbon capture pipeline that began operating in September 2025, reducing emissions from Midwest ethanol plants by capturing carbon dioxide and transporting it to be permanently stored underground in Wyoming. The pipeline repurposed an existing natural gas line and connects 11 ethanol plants in Nebraska and one in Iowa to a storage site in southeast Wyoming.
- Status
- Under Construction
- Sector
- Natural Gas
- Location
- Nebraska, Iowa, Wyoming, United States of America
- Updated
- 22 Jul 2026
- Source
- CIProud
ConstructChat
Ask ConstructChat about Tallgrass Trailblazer Carbon Capture Pipeline
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | operational |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A multi-state carbon capture pipeline that began operating in September 2025, reducing emissions from Midwest ethanol plants by capturing carbon dioxide and transporting it to be permanently stored underground in Wyoming. The pipeline repurposed an existing natural gas line and connects 11 ethanol plants in Nebraska and one in Iowa to a storage site in southeast Wyoming. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Nebraska, Iowa, Wyoming |
Source
Source | CIProud |
URL |
More Details
Record type | Project |
Sector | Natural Gas |
Article published date | 2025-11-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
