logo
ProjectPlanned

Talmadge Bridge Cable Replacement Project

Planned · Georgia · Last reported May 2026

Source: Statesboro Herald

Georgia Department of Transportation will replace cables on the Talmadge Bridge over the Savannah River to increase air draft from 185 feet to about 205 feet, allowing larger vessels to pass. The bridge will remain operational during construction.

Status
Prospective
Sector
Bridge
Location
Savannah, Georgia, United States of America
Updated
19 Nov 2026
Source
Statesboro Herald

ConstructChat

Ask ConstructChat about Talmadge Bridge Cable Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Talmadge Bridge Cable Replacement Project” is an infrastructure initiative in the Bridge sector, located in Savannah, Georgia, United States. Taiyo aggregates data on it from Statesboro Herald.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Georgia Department of Transportation will replace cables on the Talmadge Bridge over the Savannah River to increase air draft from 185 feet to about 205 feet, allowing larger vessels to pass. The bridge will remain operational during construction.

Original sector

Transportation

Location

Country

United States of America (USA)

State

Georgia

City

Savannah

Source

Source

Statesboro Herald

URL

More Details

Record type

Project

Sector

Bridge

Article published date

2026-05-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project