Tamalpais Berry Retaining Wall
Sector: Road • Location: Fairfax, California, United States of America
Source: Dodge USA
r TAMALPAIS BERRY TRAIL ROADWAY STABILIZATION AND RETAINING WALL PROJECT. Scope of work shall include construction of a new soldier pile and Wood or Concrete lagging retaining wall. The new retaining wall will be constructed on the slope between the intersection of Berry Trail and Tamalpais Road and the water supply pump station below.The work will include removal of damaged wall debris and repair
- Status
- Closed
- Sector
- Road, Cement, Commercial, Consumer Products, Water Supply and Storage, Government, Manufacturing (Industrial)
- Location
- Fairfax, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Tamalpais Berry Retaining Wall
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | r TAMALPAIS BERRY TRAIL ROADWAY STABILIZATION AND RETAINING WALL PROJECT. Scope of work shall include construction of a new soldier pile and Wood or Concrete lagging retaining wall. The new retaining wall will be constructed on the slope between the intersection of Berry Trail and Tamalpais Road and the water supply pump station below.The work will include removal of damaged wall debris and repair of roadway along edge of wall |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Fairfax |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Road, Cement, Commercial, Consumer Products, Water Supply and Storage, Government, Manufacturing (Industrial) |
Article published date | 2024-08-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- SIX STREETS IN FAYETTEVILLE
- SR 49 @ SWEETWATER CRK & VINEY CRK 1 MI S OF ANDERSONVILLE
- CS 600/S CHURCH STREET FROM SR 30 TO W PINE STREET - TIA
