logo

Tamazunchale Pipeline

Sector: Commercial • Location: Mexico

Source: World Bank Group

Project
Active

On June 17, 2005 TransCanada Corporation was awarded a 26 year build own operate (boo) contract for a 125km natural gas pipeline in east-central Mexico by Mexico’s Comision Federal de Electricidad (CFE). The pipeline was designed to connect an electricity generation station near Tamazunchale to a Pemex Gas facility near Naranjos, Veracruz. The pipeline was to have an initial capacity of 170 millio

Project Information FAQ

Project Information

5 Q
The project “Tamazunchale Pipeline” is an infrastructure initiative in the Commercial sector, located in Mexico. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

On June 17, 2005 TransCanada Corporation was awarded a 26 year build own operate (boo) contract for a 125km natural gas pipeline in east-central Mexico by Mexico’s Comision Federal de Electricidad (CFE). The pipeline was designed to connect an electricity generation station near Tamazunchale to a Pemex Gas facility near Naranjos, Veracruz. The pipeline was to have an initial capacity of 170 million cubic feet per day (mmcf/d). Plans existed to expand capacity to 430 mmcf/d in 2009 to meet the needs of additional proposed power plants. Transcanada placed the winning bid for construction at US $181.1 million over a consortium of Petrobras (Brazil) and Technit (Italy-Argentina) for US $208.2 million. Construction began in 2005, and by the end of the March 2006 (1Q), TransCanda had invested a significant amount of its own resources on the project. The pipeline was commissioned in September 2006 and began commercial operations on December 1, 2006. The operation of the pipeline was executed by TransCanada’s wholly owned subsidiary Transportadora de Gas Natural de La Huasteca (TGNH).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data