logo

Tamil Nadu and Puducherry Coastal Disaster Risk Reduction Project

Sector: Road • Location: India

Source: World Bank

Project
Closed

The objective of the Tamil Nadu and Puducherry Coastal Disaster Risk Reduction Project for India is increasing the resilience of coastal communities in Tamil Nadu and Puducherry, to a range of hydrometeorological and geophysical hazards along with improving project implementation entities’ capacity to respond promptly and effectively to an eligible crisis or emergency. The project has five compone

Status
Closed
Sector
Road, Water Supply and Storage, Broadband, Waste Processing and Treatment, Seaport, Forest Products and Packaging, Telecommunications, Commercial, Raw Materials, Hydro, Hospital, Education, Government
Location
India
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Tamil Nadu and Puducherry Coastal Disaster Risk Reduction Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tamil Nadu and Puducherry Coastal Disaster Risk Reduction Project” is an infrastructure initiative in the Road sector, located in India. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The objective of the Tamil Nadu and Puducherry Coastal Disaster Risk Reduction Project for India is increasing the resilience of coastal communities in Tamil Nadu and Puducherry, to a range of hydrometeorological and geophysical hazards along with improving project implementation entities’ capacity to respond promptly and effectively to an eligible crisis or emergency. The project has five components. The first component is vulnerability reduction. The objective of this component is to reduce the vulnerability of coastal communities through infrastructure such as permanent houses, evacuation shelters and routes, and resilient electrical networks. It has following three sub-components: (i) resilient housing; (ii) evacuation shelters, routes and early warning systems; and (iii) cyclone resilient electrical network. The second component is sustainable fisheries. The objective of this component is to address gaps in the context of a long term vision for the fisheries sector. The component aims at upgrading infrastructure, developing an approach for co-management of fisheries and addressing safety at sea. This component has following two sub-components: (a) fishing infrastructure; and (b) Second Fisheries Management for Sustainable Livelihood (FIMSUL II). The third component is capacity building in disaster risk management. This component will focus on strengthening the capacity of government institutions, civil society, the school education system and coastal communities through following four sub-components: (i) strengthening of state disaster management authority; (ii) Community Based Disaster Risk Management Program (CBDRM); (iii) curriculum development on disaster risk reduction for schools and training institutions; and (iv) completing preparation of the Integrated Coastal Zone Management (ICZM) plan for Tamil Nadu, completing erection of High Tide Line (HTL) pillars across all 13 coastal districts and stake holder training on coastal zone management. The fourth component is implementation support. This will include incremental operating costs, that of operating the Project Management Unit (PMU) and respective Project Implementation Units (PIUs) in the line departments. In addition, the component will include consultancies required for the preparation and supervision of specific activities, trainings, exposure visits and knowledge exchange programs. The fifth component is contingent emergency financing. This component will draw resources from the unallocated expenditure category and or allow the government of Tamil Nadu and or Puducherry to request the Bank to re-categorize and reallocate financing from other project components to partially cover emergency response and recovery costs.

Original sector

FY17 - Agriculture, Fishing and Forestry,FY17 - Industry, Trade and Services,FY17 - Public Administration,FY17 - Social Protection,FY17 - Transportation,FY17 - Water, Sanitation and Waste Management

Budget

Location

Country

India

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Broadband, Waste Processing and Treatment, Seaport, Forest Products and Packaging, Telecommunications, Commercial, Raw Materials, Hydro, Hospital, Education, Government

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project