Tampa (FL) Walmart Supercenter 2740-1018 SP
One of 10,000+ projects Taiyo tracks in Florida.
Source: Dodge
Existing Perimeter Walls To Remain. Ceiling Grid To Remain, Unless Noted Otherwise On Plans . Replace Ceiling Tiles Per Plans. Existing Light Fixtures To Remain, Replace Non- Working Lamps, Clean Lenses. Add Power And Data. Clean Existing Hvac Diffusers And Grilles, Relocate As Indicated On Plans. Paint Interior Wall Finishes, Install New Wall Finishes Per Plans. Clean Existing Epoxy Floor Finish.
- Status
- Closed
- Sector
- Power Generation (CCGT), Manufacturing (Industrial), Commercial
- Location
- Tampa, Florida, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Tampa (FL) Walmart Supercenter 2740-1018 SP
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Existing Perimeter Walls To Remain. Ceiling Grid To Remain, Unless Noted Otherwise On Plans . Replace Ceiling Tiles Per Plans. Existing Light Fixtures To Remain, Replace Non- Working Lamps, Clean Lenses. Add Power And Data. Clean Existing Hvac Diffusers And Grilles, Relocate As Indicated On Plans. Paint Interior Wall Finishes, Install New Wall Finishes Per Plans. Clean Existing Epoxy Floor Finish. Install Signage At Bulkhead, Patch And Repair Bulkhead And Paint As Needed. Install Walls, Equip... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Florida |
City | Tampa |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Manufacturing (Industrial), Commercial |
Article published date | 2025-08-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- FY 2018-JENKINS COUNTY-SEC.5311-OPERATIONS ONLY
- N CENTRAL AVE PEDESTRIAN &TRANSIT IMPROVEMENT STUDY-PHASE II
- MHA Nation Tribal Broadband Project
- Lower Elwha Klallam Tribe Tribal Broadband Connectivity Program
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Shop 1 Building Replacement
- North Creek Trail Section 4-Phase 2 & 3
