Tampa’s Westshore Interchange Reconstruction
Sector: Airport • Location: Tampa, Florida, United States of America (USA)
Source: Florida Department of Transportation (FDOT)
This project will fully reconstruct Tampa’s Westshore Interchange (I-275/SR 60) with a modern design and added capacity with general use and express lanes. The updated design includes flyover ramps providing better traffic operations including the replacement of the existing loop ramp from eastbound SR 60 to northbound I-275. Additional improvements include widening I-275 to construct two new expr
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | ongoing |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | This project will fully reconstruct Tampa’s Westshore Interchange (I-275/SR 60) with a modern design and added capacity with general use and express lanes. The updated design includes flyover ramps providing better traffic operations including the replacement of the existing loop ramp from eastbound SR 60 to northbound I-275. Additional improvements include widening I-275 to construct two new express lanes in each direction and reconstruct the general use lanes, widening SR 60 to add additional capacity, constructing a new flyover ramp from the Howard Frankland Bridge to westbound SR 60 towards the Tampa International Airport, adding a new on-ramp from Reo Street to southbound I-275, and reconnecting three local roadways at Reo Street, Occident Street, and Trask Street to help improve local traffic circulation. Aesthetic treatments and shared use path connectivity to the existing trail network and to the new shared use path currently under construction as part of the Howard Frankland Bridge project. Once complete, the express lanes will provide drivers with a new choice and reliable travel times. The design will also accommodate future transit along I-275. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
