Tan Coffee / Son Studio
The status, timeline and source of this project. A free account opens every field.
Source: ArchDaily
The bar is placed in the front, by the main door, for ease of access. The office, storage room, and toilet are in the back, along with another indoor garden as the main green space of the whole architecture. The main materials in use are concrete walls and ceilings, steel, glass, and recycled wood. The furniture is of an industrial style, compatible with the overall design.Text description provide
- Status
- Closed
- Sector
- Steel, Hydro, Cement, Wind, Manufacturing (Industrial), Residential, Metal, Commercial, Warehouse
- Updated
- 22 Jul 2026
- Source
- ArchDaily
ConstructChat
Ask ConstructChat about Tan Coffee / Son Studio
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The bar is placed in the front, by the main door, for ease of access. The office, storage room, and toilet are in the back, along with another indoor garden as the main green space of the whole architecture. The main materials in use are concrete walls and ceilings, steel, glass, and recycled wood. The furniture is of an industrial style, compatible with the overall design.Text description provided by the architects.From the initial idea of an abandoned factory, we dissembled the old structure and replaced it with a steel and concrete one, except for the front house whose concrete ceiling and old walls were left intact. The tin roof of the middle house was raised to give the feeling of "a factory". Big concrete pillars are used to divide up the space and big windows are to allow light and wind in. An indoor garden helps ease the heavy visual of concrete and steel.The most difficult task for the architect as well as the construction team was to create a color of past times, as the initial idea was of "an abandoned factory." Therefore, the tin roof was recycled, steel structures were artificially rusted using additives, the concrete ceiling was left intact from the remains of the old house, and wood parts were recycled from other old constructions. After 6 months of design and renovation, we now present "a cafe inside of an abandoned factory." |
Location
| Not available for this record. |
Source
Source | ArchDaily |
URL |
More Details
Record type | Project |
Sector | Steel, Hydro, Cement, Wind, Manufacturing (Industrial), Residential, Metal, Commercial, Warehouse |
Article published date | 2025-06-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 7; SR 91 & SR 520 @ 4 LOCS - BRIDGE PRESERVATION
- SR 83 @ SHOAL CREEK
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Transport and Rescue Squadron Hangar Facility - 19 Wing CFB Comox 442
- Safeway Refrigerated Warehouse
- Fire Lake Mining
- Kearl Ore Preparation Plant
