logo

Tangier Mediterranean Port - First Container Terminal

Sector: Commercial • Location: Morocco

Source: World Bank Group

Project
Active

In November 2004, a consortium led by APM Terminals, the port operating arm of Denmark's A.P. Moller-Maersk, was awarded a 30-year BOT contract by the Tangiers Mediterranean Special Agency (TMSA) to develop a greenfield container terminal at the Tangier Mediterranean Port, Morocco. This container terminal was designed to have a capacity of 1.3 million TEU per annum.

APM Terminals Tangier S.A (A

Project Information FAQ

Project Information

4 Q
The project “Tangier Mediterranean Port - First Container Terminal” is an infrastructure initiative in the Commercial sector, located in Morocco. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In November 2004, a consortium led by APM Terminals, the port operating arm of Denmark's A.P. Moller-Maersk, was awarded a 30-year BOT contract by the Tangiers Mediterranean Special Agency (TMSA) to develop a greenfield container terminal at the Tangier Mediterranean Port, Morocco. This container terminal was designed to have a capacity of 1.3 million TEU per annum. APM Terminals Tangier S.A (APMTT), a joint venture between AP Moller Maersk (90%) and Casablance based AKWA Group (10%), was established in March 2005 to implement this project. The winning consortium won this project in an international competitive tender, conducted by TMSA, by beating the other finalist – a constorium of France’s CMA-CGM, Taiwan-based Evergreen and the UK’s P&O. The total cost of the container terminal was estimated at US$ 200 million ( 160 million euros) . In addition, APMTT was expected to pay a monthly rental fee that was estimated to total US$ 125 million over the term of the contract and also guarantee the utilization of the terminal's capacity. Information on the details of the financial closure was not available from public sources. Construction work began in May 2006. The terminal was scheduled to commence full commercial operations in September 2007. Unable to find the year of FC. Hence using constract sign date. E-mail contact at APM: CENAPMTPRJ@apmterminals.com None

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data