logo

Tangiers (El Hachef) drinking water supply project

Sector: Residential • Location: Morocco

Source: African Development Bank (AfDB)

Project

This intervention relates to the Tangiers (El Hachef) drinking water supply project. This project is part of the long-term water supply program of the city of Tangier. It should contribute to: (i) meeting the additional demand in urban areas in order to maintain the level of consumption of 150l / d / person and (ii) to increase the rural water endowment from 15 to 50l / d / person. The main compon

Project Information FAQ

Project Information

4 Q
The project “Tangiers (El Hachef) drinking water supply project” is an infrastructure initiative in the Residential sector, located in Morocco. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This intervention relates to the Tangiers (El Hachef) drinking water supply project. This project is part of the long-term water supply program of the city of Tangier. It should contribute to: (i) meeting the additional demand in urban areas in order to maintain the level of consumption of 150l / d / person and (ii) to increase the rural water endowment from 15 to 50l / d / person. The main components of the project are as follows: A) extension of the Charf El Akab pumping station; (B) supply and installation of water supply pipes; C) provision of operating and maintenance equipment to the RAID; D) study and equipment for the exploitation of Charf El Akab aquifer; E) study of the master plan water of the city of Tangier; F) study of the master plan of electrification of the city of Tangier; and G) supervision and control of works.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data