logo

Tanjung Priok Koja Container Terminal

Sector: Water Supply and Storage • Location: Indonesia

Source: World Bank Group

Project
Active

Tanjung Priok is the country's main port for international trade. This port handles 65% of imports and 45% of exports in volume to and from Indonesia. In the past 5 years the flows of containerized goods in Tanjung Priok have grown 20% annually. Since the operation of the conventional container terminal owned by Pelindo II in 1978, loading and unloading of containerized goods have continued to inc

Status
Prospective
Sector
Water Supply and Storage, Seaport, Government
Location
Indonesia
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Tanjung Priok Koja Container Terminal

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tanjung Priok Koja Container Terminal” is an infrastructure initiative in the Water Supply and Storage sector, located in Indonesia. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Tanjung Priok is the country's main port for international trade. This port handles 65% of imports and 45% of exports in volume to and from Indonesia. In the past 5 years the flows of containerized goods in Tanjung Priok have grown 20% annually. Since the operation of the conventional container terminal owned by Pelindo II in 1978, loading and unloading of containerized goods have continued to increase via Tanjung Priok. Terminal construction began in mid-1995. After a trial run for several months the Koja container terminal (TPK) in Jakarta was commissioned by President Suharto in March 1998. The terminal, located near the Tanjung Priok port is the first modem container terminal in the country. The terminal has been built by PT Humpuss Terminal Petikemas, under the Operation Cooperation (KSO) scheme with PT Pelabuhan Indonesia II (Pelindo II) as the port authority. The terminal includes a 450 meter long quay with a 14 meters LWS deep port basin, container open storage facility over a 15 hectare lot of land and 5 units of crane and 20 units of transtainer. The first phase of the Koja terminal, which has a 600,000 TEUs capacity, was estimated to cost about US$ 111.4 million. PT Humpuss Terminal Petikemas (HTP), a subsidiary of Humpuss Group, delayed construction of the second phase of Koja Container Terminal (TPK). It was scheduled to begin in 1998 and completed in 1999. However, the persistent economic crisis has trimmed down the export-import volume so that the occupancy ratio of Koja Container Terminal I is only 40%. In July 2000, Hutchison Port Holdings (HPH) bought out PT HTP's 48% share in Koja Container Terminal. As of Dec. 31, 2008, HPH - a joint venture of Hutchison Whampoa Ltd (HWL) (80%) and PSA Corp. (20%) since 2006 - had a 45% equity interest in Koja Container Terminal, equating to a 36% share for HWL and a 9% share for PSA Corp. The remainder of the equity (55%) was owned by Pelindo II. In 1996, loading and unloading of containerized cargoes in Tanjung Priok totaled 1.4 million TEUs. Loading and unloading of international cargoes in Tanjung Priok totaled 42.3 million tons and 54.2 % of which were containerized cargoes.

Original sector

Transport

Budget

Location

Country

Indonesia

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Seaport, Government

Article published date

2024-09-27

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project