logo

Tantia Raxaul Tollway Private Limited

One of 10,000+ projects Taiyo tracks in India.

Source: World Bank Group

Project
Active

In January 2011, the National Highway Authority of India (NHAI) awarded a 20 year concession (including construction period of 30 months) to a consortium of Tantia Construction Limited and Jiangsu Provincial Engineering Transportation Group Company Limited (China) for the strengthening,improvement, 2-laning, operation and maintenance of 68.79kms (from KM 82.00 to KM 188.60) of Motihari-Piprakoti-R

Status
Prospective
Sector
Waste Processing and Treatment, Road, Bridge, Government, Residential, Automotive, Commercial
Location
India
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Tantia Raxaul Tollway Private Limited

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tantia Raxaul Tollway Private Limited” is an infrastructure initiative in the Waste Processing and Treatment sector, located in India. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Company

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

In January 2011, the National Highway Authority of India (NHAI) awarded a 20 year concession (including construction period of 30 months) to a consortium of Tantia Construction Limited and Jiangsu Provincial Engineering Transportation Group Company Limited (China) for the strengthening,improvement, 2-laning, operation and maintenance of 68.79kms (from KM 82.00 to KM 188.60) of Motihari-Piprakoti-Raxaul section of National Highway-28A (NH-28A) in the state of Bihar. Under the contract, the consortium was responsible for the design, construction, finance, operation and maintenance and strengthening of the existing carriageway to a 2-lane highway with paved shoulders. The scope includes strengthening & maintenance of existing carriageway including construction of new pavement, rehabilitation of existing pavement, construction and/or rehabilitation of major and minor bridges, culverts, service roads, road intersections,interchanges, drains,etc.The expansion project was a part of National Highway Development Project Phase -III and was expected to ease traffic congestion on this busy section. The consortium of Tantia Construction Limited (74% equity) and Jiangsu Provincial Engineering Transportation Group Company Limited (26% equity),established a special purpose vehicle, Tantia Raxaul Tollway Private Limited, to implement the project. The SPV won the tender through competitive bidding, conducted by NHAI,by quoting the lowest upfront subsidy from NHAI of US$31.9mn (INR 1498mn @47 INR/USD).Under the contract, the SPV was to recover the capital costs and operating costs including returns through tolling during the term of concession.Tantia Construction Limited was the EPC contractor for the project. The project attained financial closure on 28th September 2011. The grant/debt/equity ratio of the project was 25.9/35.3/38.8. The estimated capital cost of the project at the time of financial closure was US$ 123.2mn (INR 5791.1 mn @ 47 INR/USD) million. Apart from the NHAI subsidy, financing comprised INR 2045.1mn 15year term loan,and INR 2248mn sponsor equity. The INR 2045.1mn term loan had a grace period of 1 year, a repayment schedule of 46 quarterly instalments and was priced at 150bps over prime lending rate of Indian Bank.The debt was arranged by SBI Capital. The participating banks were Indian Bank(450mn),State Bank of Patiala(400mn),Bank of India(350mn),Dena Bank Ltd (300mn),IIFCL (295.1mn),Oriental Bank of Commerce (250mn). Construction on the project began in October 2011 and was expected to be completed by April 2014.

Original sector

Transport

Procurement method

Budget

Location

Country

India

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Waste Processing and Treatment, Road, Bridge, Government, Residential, Automotive, Commercial

Article published date

2024-09-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project