TANZAM HIGHWAY
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The proposed project consists of (i) the realignment and reconstruction to two-lane asphalt paved standard of the existing earth/gravel sections of the Ten-Zam Highway from a point 38 miles west of Morogoro to Mahenge (a length of 102 miles) including the Ruaha River bridge at Mauyuni, and from Iringa to Iyayi (a length of 125 miles); (ii) the reconstruction to two-lane asphalt paved standard of t
- Status
- Closed
- Sector
- Road, Bridge, Government
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about TANZAM HIGHWAY
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed project consists of (i) the realignment and reconstruction to two-lane asphalt paved standard of the existing earth/gravel sections of the Ten-Zam Highway from a point 38 miles west of Morogoro to Mahenge (a length of 102 miles) including the Ruaha River bridge at Mauyuni, and from Iringa to Iyayi (a length of 125 miles); (ii) the reconstruction to two-lane asphalt paved standard of the existing paved but low standard sections of the Tan-Zam Highway from Morogoro to a point 38 miles to the west and from Mahenge to Iringa (a length of 45 miles); and (iii) consultant's services for engineering supervision of the above works. Concurrently USAID is financing reconstruction of the highway from Iyayi to Tunduma (145 miles) on the Zambia border. Reconstruction of the Zambia section of the highway from Tunduma to Kapiri Mposhi is being financed by the Government of Zambia, the United Kingdom and two loans from the Bank. |
Original sector | Transportation |
Location
Country | Tanzania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of made-up textile articles, except apparel/GSM FOAM CO LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of basic iron and steel/Quaim Steel Mills Ltd
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of articles of concrete, cement and plaster/Lake Group (Premix)
- Open for FDI through a majority stake/Purchase of new machinery and equipment/Manufacture of machinery for food, beverage and tobacco processing/Tall Welding & Fabrications
- Dar es Salaam Water Distribution
- Kahama Mining Corp. Ltd.
