logo

Tanzania - Backbone Transmission Investment Project

Sector: Power Generation (CCGT) • Location: Tanzania

Source: World Bank Group

Project
Closed

The development objective of the Backbone Transmission Investment Project is to increase availability, reliability, and quality of grid based power supply to northern regions of Tanzania. There are two components to the project. The first component of the project is construction of the transmission line. This component will finance one section of the overhead 400kV double-circuit backbone transmis

Project Information FAQ

Project Information

5 Q
The project “Tanzania - Backbone Transmission Investment Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Tanzania. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Backbone Transmission Investment Project is to increase availability, reliability, and quality of grid based power supply to northern regions of Tanzania. There are two components to the project. The first component of the project is construction of the transmission line. This component will finance one section of the overhead 400kV double-circuit backbone transmission interconnection between the towns of Iringa and Shinyanga (including a Fiber Optic Communication Line (FOCL) and the Shield Wire System (SWS) as a local distribution technology; and the expansion of the associated 220kV substations at Iringa, Dodoma, Singida, and Shinyanga. This component is estimated to cost about US$434.76 million (including contingencies, but excluding taxes and duties). Specifically, the International Development Association (IDA) credit will finance one of the three sections of this transmission line, namely from Iringa to Dodoma. The second component of the project is technical assistance to Tanzania Electric Supply Company Limited (TANESCO). It is that about US$10.0 million is allocated for technical assistance to the implementing agency (TANESCO) for the project. Upon a careful review of TANESCO's requirements for urgent technical assistance, this component will support the implementing agency through consultancy contracts related to: (i) engineering/safeguard supervision and monitoring consultant for implementation support for the proposed backbone transmission line, and (ii) improve technical, legal, financial, and safeguards capacity of TANESCO in preparing and managing projects.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data