logo
ProjectClosed

Tanzania - Backbone Transmission Investment Project

Sector: Power Generation (CCGT) • Location: Tanzania

Source: World Bank

The development objective of the Backbone Transmission Investment Project is to increase availability, reliability, and quality of grid based power supply to northern regions of Tanzania. There are two components to the project. The first component of the project is construction of the transmission line. This component will finance one section of the overhead 400kV double-circuit backbone transmis

Status
Closed
Sector
Power Generation (CCGT), Broadband, Telecommunications, Government, Hydro
Location
Tanzania
Updated
22 Jul 2026
Source
World Bank

ConstructChat

Ask ConstructChat about Tanzania - Backbone Transmission Investment Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Tanzania - Backbone Transmission Investment Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Tanzania. Taiyo aggregates data on it from World Bank.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The development objective of the Backbone Transmission Investment Project is to increase availability, reliability, and quality of grid based power supply to northern regions of Tanzania. There are two components to the project. The first component of the project is construction of the transmission line. This component will finance one section of the overhead 400kV double-circuit backbone transmission interconnection between the towns of Iringa and Shinyanga (including a Fiber Optic Communication Line (FOCL) and the Shield Wire System (SWS) as a local distribution technology; and the expansion of the associated 220kV substations at Iringa, Dodoma, Singida, and Shinyanga. This component is estimated to cost about US$434.76 million (including contingencies, but excluding taxes and duties). Specifically, the International Development Association (IDA) credit will finance one of the three sections of this transmission line, namely from Iringa to Dodoma. The second component of the project is technical assistance to Tanzania Electric Supply Company Limited (TANESCO). It is that about US$10.0 million is allocated for technical assistance to the implementing agency (TANESCO) for the project. Upon a careful review of TANESCO's requirements for urgent technical assistance, this component will support the implementing agency through consultancy contracts related to: (i) engineering/safeguard supervision and monitoring consultant for implementation support for the proposed backbone transmission line, and (ii) improve technical, legal, financial, and safeguards capacity of TANESCO in preparing and managing projects.

Original sector

FY17 - Energy and Extractives

Budget

Location

Country

Tanzania

Source

Source

World Bank

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Broadband, Telecommunications, Government, Hydro

Article published date

2025-12-15

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project