Tanzania - Dar es Salaam Bus Rapid Transit System Project – Phase 2
Sector: Manufacturing (Industrial) • Location: Tanzania
Source: African Development Bank (AfDB)
The Dar es Salaam Bus Rapid Transit (BRT) Project-Phase 2 involves the construction of infrastructure that includes 20.3km of exclusive BRT lanes and Non Motorised Transport (NMT) facilities along Kilwa Road corridor and part of Kawawa Road. The project corridor traverses from Mbagala Area in Temeke District to the Central Business District where it connects with Phase 1 of the BRT system at the K
- Sector
- Manufacturing (Industrial), Government, Mass Transit, Road, Residential
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Tanzania - Dar es Salaam Bus Rapid Transit System Project – Phase 2
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Dar es Salaam Bus Rapid Transit (BRT) Project-Phase 2 involves the construction of infrastructure that includes 20.3km of exclusive BRT lanes and Non Motorised Transport (NMT) facilities along Kilwa Road corridor and part of Kawawa Road. The project corridor traverses from Mbagala Area in Temeke District to the Central Business District where it connects with Phase 1 of the BRT system at the Kariakoo hub. The Provision of BRT system is expected to directly enhance and improve the traffic circulation and eliminate bottlenecks to traffic flow to various economic activity centers such as the industrial zones, and the vast populous residential areas of Temeke Municipality. The proposed project would therefore impact positively on the informal and formal businesses by providing them with improved accessibility and enhanced roadside air quality. It is further estimated that by improving the existing road and public transport system, the annual vehicular GHG emission rates in tones would drop by at least 60% due to improved average traffic operating speeds along the project corridor and particularly by the use large modern buses that uses modern technology and cleaner fuels in the BRT system. The project will be implemented over a 4 year period (2016-2020). The total cost net of taxes is USD 159.32m (TZS 285.1 billion). |
Original sector | Transport & Storage |
Budget |
Location
Country | Tanzania |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Government, Mass Transit, Road, Residential |
Article published date | 2025-03-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
