logo
Project

Tanzania - Dar es Salaam Bus Rapid Transit System Project – Phase 2

Sector: Manufacturing (Industrial) • Location: Tanzania

Source: African Development Bank (AfDB)

The Dar es Salaam Bus Rapid Transit (BRT) Project-Phase 2 involves the construction of infrastructure that includes 20.3km of exclusive BRT lanes and Non Motorised Transport (NMT) facilities along Kilwa Road corridor and part of Kawawa Road. The project corridor traverses from Mbagala Area in Temeke District to the Central Business District where it connects with Phase 1 of the BRT system at the K

Sector
Manufacturing (Industrial), Government, Mass Transit, Road, Residential
Location
Tanzania
Updated
22 Jul 2026
Source
African Development Bank (AfDB)

ConstructChat

Ask ConstructChat about Tanzania - Dar es Salaam Bus Rapid Transit System Project – Phase 2

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tanzania - Dar es Salaam Bus Rapid Transit System Project – Phase 2” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Tanzania. Taiyo aggregates data on it from African Development Bank (AfDB).

Participants

Sponsoring Agency

Status

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Dar es Salaam Bus Rapid Transit (BRT) Project-Phase 2 involves the construction of infrastructure that includes 20.3km of exclusive BRT lanes and Non Motorised Transport (NMT) facilities along Kilwa Road corridor and part of Kawawa Road. The project corridor traverses from Mbagala Area in Temeke District to the Central Business District where it connects with Phase 1 of the BRT system at the Kariakoo hub. The Provision of BRT system is expected to directly enhance and improve the traffic circulation and eliminate bottlenecks to traffic flow to various economic activity centers such as the industrial zones, and the vast populous residential areas of Temeke Municipality. The proposed project would therefore impact positively on the informal and formal businesses by providing them with improved accessibility and enhanced roadside air quality. It is further estimated that by improving the existing road and public transport system, the annual vehicular GHG emission rates in tones would drop by at least 60% due to improved average traffic operating speeds along the project corridor and particularly by the use large modern buses that uses modern technology and cleaner fuels in the BRT system. The project will be implemented over a 4 year period (2016-2020). The total cost net of taxes is USD 159.32m (TZS 285.1 billion).

Original sector

Transport & Storage

Budget

Location

Country

Tanzania

Source

Source

African Development Bank (AfDB)

URL

More Details

Record type

Project

Sector

Manufacturing (Industrial), Government, Mass Transit, Road, Residential

Article published date

2025-03-26

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project