logo

Tanzania - Dar es Salaam Bus Rapid Transit System Project – Phase 2

Sector: Mass Transit • Location: Tanzania

Source: African Development Bank (AfDB)

Project

The Dar es Salaam Bus Rapid Transit (BRT) Project-Phase 2 involves the construction of infrastructure that includes 20.3km of exclusive BRT lanes and Non Motorised Transport (NMT) facilities along Kilwa Road corridor and part of Kawawa Road. The project corridor traverses from Mbagala Area in Temeke District to the Central Business District where it connects with Phase 1 of the BRT system at the K

Project Information FAQ

Project Information

4 Q
The project “Tanzania - Dar es Salaam Bus Rapid Transit System Project – Phase 2” is an infrastructure initiative in the Mass Transit sector, located in Tanzania. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Dar es Salaam Bus Rapid Transit (BRT) Project-Phase 2 involves the construction of infrastructure that includes 20.3km of exclusive BRT lanes and Non Motorised Transport (NMT) facilities along Kilwa Road corridor and part of Kawawa Road. The project corridor traverses from Mbagala Area in Temeke District to the Central Business District where it connects with Phase 1 of the BRT system at the Kariakoo hub. The Provision of BRT system is expected to directly enhance and improve the traffic circulation and eliminate bottlenecks to traffic flow to various economic activity centers such as the industrial zones, and the vast populous residential areas of Temeke Municipality. The proposed project would therefore impact positively on the informal and formal businesses by providing them with improved accessibility and enhanced roadside air quality. It is further estimated that by improving the existing road and public transport system, the annual vehicular GHG emission rates in tones would drop by at least 60% due to improved average traffic operating speeds along the project corridor and particularly by the use large modern buses that uses modern technology and cleaner fuels in the BRT system. The project will be implemented over a 4 year period (2016-2020). The total cost net of taxes is USD 159.32m (TZS 285.1 billion).

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data