logo

Tanzania - Dar es Salaam Supply and Sanitation Project

Sector: Manufacturing (Industrial) • Location: Tanzania

Source: African Development Bank (AfDB)

Project

The project is intended to contribute to the improvement in health for residents and visitors to dar es Salaam by improving the quality of water provided and the quality and reliability of supply. The project also introduces the principles of a three first time connection for domestic consumers, and of a lifeline tariff below average coast. It primarily addresses the issues of institutional capaci

Project Information FAQ

Project Information

4 Q
The project “Tanzania - Dar es Salaam Supply and Sanitation Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Tanzania. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project is intended to contribute to the improvement in health for residents and visitors to dar es Salaam by improving the quality of water provided and the quality and reliability of supply. The project also introduces the principles of a three first time connection for domestic consumers, and of a lifeline tariff below average coast. It primarily addresses the issues of institutional capacity through its support for the sector reforms to facilitate the introduction of private sector in water supply and sanitation infrastructure and more directly in technical assistance support to the Public Granting and Asset Holding Authority the Dar es Salaam Water Supply and Sewerage Authority. The project is divided into five main components as follows: (i) Water Supply Rehabilitation and Extension; (ii) Wastewater facilities Rehabilitation and Extension; (iii) Community Water Supply and Sanitation Programme: this component of a targets the majority of the poor who, despite the improvements in the project, will not directly derive access to the centralized services; (iv) Institutional Strengthening; (v) Studies for Future Projects. The project will be implemented over a period of five years with a total coast estimated at UA 114.87 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data