Tanzania - Iringa-Shinyanga Transmission Line Project

Sector: Manufacturing (Industrial) • Location: Tanzania

Source: African Development Bank (AfDB)

Project

The Iringa-Shinyanga Transmission Line Project involves the construction of an overhead line to reinforce the entire backbone transmission grid system of Tanzania. In order to avoid installing excess transmission capacity and reduce initial investment cost, the development of the project is divided into two (2) phases. Phase I of the project involves the construction of a 667 km long, 400 kV doubl

Project Information FAQ

Project Information

4 Q
The project “Tanzania - Iringa-Shinyanga Transmission Line Project” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Tanzania. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Iringa-Shinyanga Transmission Line Project involves the construction of an overhead line to reinforce the entire backbone transmission grid system of Tanzania. In order to avoid installing excess transmission capacity and reduce initial investment cost, the development of the project is divided into two (2) phases. Phase I of the project involves the construction of a 667 km long, 400 kV double-circuit backbone transmission interconnection, including the Fiber Optic Communication Line (FOCL) and the Shield Wire System (SWS). Phase II will comprise a system upgrade to 400 kV level for all associated substations (Iringa, Dodoma, Singida and Shinyanga) with the addition of 720 MVA shunt-reactor capacity. The planned upgrades will allow an increase in the transfer capacity to 1,000 MW. The implementation of the upgrade is scheduled for 2020 when the load on the line is expected to warrant that level. The existing 220kV line has already reached its technical limits and cannot handle this expected demand growth. In this context, the proposed project is of critical importance and forms part of TANESCO’s shortterm strategy for national grid transmission line reinforcement. Most of the line stretches will run parallel to the existing 220 kV line, with only minor variations in areas where alternative alignments have been proposed due to the topography of the terrain. The planned line is a 400 kV line and will have a length of approximately 670 km. It will interconnect four substations (S/S) at the Iringa, Dodoma, Singida and Shinyanga towns. The project is expected to be completed by the end of 2013 at an estimated cost UA 314 Million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data