logo

Tanzania - Kakono Hydropower Project

Sector: Power Generation (CCGT) • Location: Tanzania

Source: African Development Bank (AfDB)

Project

The proposed 87.8-megawatt (MW) Kakono Hydropower Project (HPP) is one of the energy sectoral interventions under the “economic growth” pillar of FYDP III to realize an inclusive and competitive economy by increasing the generation capacity to improve the availability and reliability of electricity supply. The Kakono HPP, together with the ongoing and planned projects in the north-western part of

Project Information FAQ

Project Information

4 Q
The project “Tanzania - Kakono Hydropower Project” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Tanzania. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The proposed 87.8-megawatt (MW) Kakono Hydropower Project (HPP) is one of the energy sectoral interventions under the “economic growth” pillar of FYDP III to realize an inclusive and competitive economy by increasing the generation capacity to improve the availability and reliability of electricity supply. The Kakono HPP, together with the ongoing and planned projects in the north-western part of the country, will contribute to increased renewable energy production, thereby displacing the costly diesel generators while, at the same time, improving TANESCO’s financial health. It will also address the deficits of electricity particularly in Kagera, Geita and Mwanza regions in the Lake Zone. Specifically, the Project will complement the Bank-financed Regional Rusumo Falls hydropower transmission line projects and other related Development Partner (DP) operations in the north-western part of the country, thereby contributing to multi-country infrastructure connectivity to promote cross-border power trade. The Project will entail the construction of a concrete-faced rockfill dam (about 42 m high and 1,380 m long) and a gravity roller-compacted concrete dam (about 61 m high and 284 m long) producing a hydropower potential exploited through an outdoor powerhouse at the toe of the dam. The overall Project cost is estimated at USD 308.85 million, including contingencies but excluding local taxes and levies such as overweight road transportation surcharges, etc.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data