logo

Tanzania - Mnivata Newala Masasi (160 Km) Road Upgrading Project

Sector: Raw Materials • Location: Tanzania

Source: African Development Bank (AfDB)

Project

The Mnivata Newala Masasi (160 Km) Road Upgrading Project was designed to improve the accessibility of the 816 km long Mtwara Development Corridor (MDC) commencing from Mtwara to Mnivata up to Mbamba Bay on Lake Nyasa. The intervention is an investment project aligned to Tanzania’s FYDP III. This is for upgrading the 160 km road to bituminous standard including 84 m Mwiti Bridge and complementary

Project Information FAQ

Project Information

4 Q
The project “Tanzania - Mnivata Newala Masasi (160 Km) Road Upgrading Project” is an infrastructure initiative in the Raw Materials sector, located in Tanzania. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Mnivata Newala Masasi (160 Km) Road Upgrading Project was designed to improve the accessibility of the 816 km long Mtwara Development Corridor (MDC) commencing from Mtwara to Mnivata up to Mbamba Bay on Lake Nyasa. The intervention is an investment project aligned to Tanzania’s FYDP III. This is for upgrading the 160 km road to bituminous standard including 84 m Mwiti Bridge and complementary initiatives. The project is expected to improve accessibility of the people and goods in the zone of influence to economic centers and social services, foster trade, integration and economic development and eventually lead to reduction in poverty and enhanced resilience in the subcoastal region of Mtwara and beyond. The expected outcomes include: (a) reduced transport costs and travel times; (b) employment generation during construction and post construction phases; (c) increased agricultural production, increased investment and trading activities that will subsequently contribute to increased incomes and eventually reduction in poverty and enhanced resilience; and (d) improved road safety.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data