logo

Tanzania - Monduli District Water Supply and Sanitation Project

Sector: Raw Materials • Location: Tanzania

Source: African Development Bank (AfDB)

Project

The Monduli District Water Supply Project originated with the Government of Tanzania’s request in the nineties for the Bank Group to finance a water supply project in the area of Mto wa Mbu. The Monduli District is one of the five other districts under the region of Arusha and it is generally sparsely populated (12 persons/km2) although its population has been growing rapidly at between 3.8 and 4.

Project Information FAQ

Project Information

4 Q
The project “Tanzania - Monduli District Water Supply and Sanitation Project” is an infrastructure initiative in the Raw Materials sector, located in Tanzania. Taiyo aggregates data on it from African Development Bank (AfDB).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Obfuscated Data

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Monduli District Water Supply Project originated with the Government of Tanzania’s request in the nineties for the Bank Group to finance a water supply project in the area of Mto wa Mbu. The Monduli District is one of the five other districts under the region of Arusha and it is generally sparsely populated (12 persons/km2) although its population has been growing rapidly at between 3.8 and 4.3% (national average is 2.8%) due in part to in-migration from other more densely populated areas (estimated at 9.5% of total population growth). The project will meet one of the most critical needs of a population living under the harsh conditions of an arid environment, vulnerable to variations in annual rains and to inaccessibility of suitable water sources for domestic and livestock consumption. It will also address the inherent fragility of such environments to enhance pasture management while protecting watersheds from degradation, and catering for wildlife. The project will focus on: (i) Capacity Building at the individual, community and District Council levels (ii) Provision of Water Supply Infrastructure for domestic and livestock consumption (iii) Environment and Watershed Protected in the project centers (iv) Sanitation Improvement for the residents of the project area, and (v) Project Management and Works Supervision. It will be implemented over a period of 36 months with a total cost estimated at UA 17.234 million.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data