Tanzania - Power Interconnection Project
Sector: Road • Location: Multinational
Source: African Development Bank (AfDB)
This project involves the construction of a high voltage alternating current (HVAC) 400 kV transmission line (T-line) with a total length of 507.5 km, of which about 414.4 km are located in Tanzania and 93.1 km in Kenya. In Tanzania, the project includes the construction of a 400 kV substation in Arusha and the extension of the existing Singida substation. In Kenya, the project does not involve an
- Sector
- Road, Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Government, Warehouse
- Location
- World
- Updated
- 22 Jul 2026
- Source
- African Development Bank (AfDB)
ConstructChat
Ask ConstructChat about Tanzania - Power Interconnection Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project involves the construction of a high voltage alternating current (HVAC) 400 kV transmission line (T-line) with a total length of 507.5 km, of which about 414.4 km are located in Tanzania and 93.1 km in Kenya. In Tanzania, the project includes the construction of a 400 kV substation in Arusha and the extension of the existing Singida substation. In Kenya, the project does not involve any works related to substations. Indeed, the substation outgoing bay in Isinya is part of the existing Nairobi Reinforcement Project which is currently under construction. The proposed interconnection line, to be connected to the Ethiopia-Kenya transmission system through the Isinya – Suswa 400 kV line, is part of the Eastern Africa Electricity Highway with a transfer capacity of 2,000 MW. As such, it will be the major link for power transfer between the Eastern Africa Power Pool and countries in the North such as Sudan and Egypt. Completion of the line is expected in early 2017. |
Original sector | Energy |
Budget |
Location
Country | World |
Source
Source | African Development Bank (AfDB) |
URL |
More Details
Record type | Project |
Sector | Road, Power Transmission, Power Generation (CCGT), Hydro, Geothermal, Government, Warehouse |
Article published date | 2025-12-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Multinational
- Multinational - Road Development and Transport Facilitation Programme within the Mano River Union (Additional Loan – Côte d’Ivoire)
- Multinational Tanzania/ Rwanda - Feasibility Study of the Isaka-Kigali Railway Project
- Multinational - Sustainable Management of Endemic Ruminant Livestock in West Africa
- Multinational - Study on the Abidjan - Lagos Highway Corridor Development Project -
- Multinational - Abidjan-Lagos Corridor Highway Development Project Study (Côte d'Ivoire)
- Cameroon - Transport Facilitation Programme on the Douala – Bangui Corridors
- Multinational - Project to Rehabilitate the Lomé-Cotonou Road and Facilitate Transport on the Abidjan-Lagos Corridor – Phase I
- Multinational - Kampala-Juba-Addis Ababa-Djibouti Corridor Project
