The project comprises the construction and operation of a 667 km 400 kV AC double circuit transmission overhead line between Iringa, Dodoma, Singida and Shinyanga. The link will transfer hydropower generated in southern Tanzania to northern Tanzania, where economic growth is strong and demand for electricity increasing due to developing mining and industrial activities. Eventually the line will be

Project Information FAQ

Project Information

4 Q
The project “Tanzania Backbone Interconnector Project” is an infrastructure initiative in the Hydro sector, located in Tanzania. Taiyo aggregates data on it from European Union Africa Infrastructure Trust Fund.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

Close

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project comprises the construction and operation of a 667 km 400 kV AC double circuit transmission overhead line between Iringa, Dodoma, Singida and Shinyanga. The link will transfer hydropower generated in southern Tanzania to northern Tanzania, where economic growth is strong and demand for electricity increasing due to developing mining and industrial activities. Eventually the line will become part of the infrastructure connecting the East and Southern African Power Pools.  The USD 468m transmission project will be co-financed by the EIB (28.45%), the World Bank (29.72%), AfDB/ JICA (27.44%) and Korea EDCF (7.63%), with the balance (6.77%) financed by the Republic of Tanzania (the borrower) and/or TANESCO (the Promoter). The project is being implemented in two phases: the extension of existing substations and the construction of transmission lines for operation at 220kV under Phase 1, already completed, and their further upgrade to 400kV under Phase 2. The IRS Grant from the EU-AITF is used by EIB to reduce the interest rate applicable to its loan of EUR equivalent of USD 134.5m, so that it reaches the IMF concessionality requirements. As of December 2018, EUR 5.49m of the EU-AITF subsidy has been utilised.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data