Tanzania Cities Transforming Infrastructure & Competitiveness Project
One of 3,621 projects Taiyo tracks in Tanzania.
Source: World Bank Group
The Tanzania Cities Transforming Infrastructure and Competitiveness Project will support urban development by strengthening urban management and improving access to basic infrastructure and services in participating urban areas in Tanzania. The theory of change underlying this project is that strengthening urban management will ensure the efficiency and sustainability of prioritized infrastructure
- Status
- Prospective
- Sector
- Road, Water Supply and Storage, Manufacturing (Industrial), Biomass, Commercial, Waste Processing and Treatment, Government, Residential
- Location
- Tanzania
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Tanzania Cities Transforming Infrastructure & Competitiveness Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Tanzania Cities Transforming Infrastructure and Competitiveness Project will support urban development by strengthening urban management and improving access to basic infrastructure and services in participating urban areas in Tanzania. The theory of change underlying this project is that strengthening urban management will ensure the efficiency and sustainability of prioritized infrastructure and therefore enhance the productivity, livability, and resilience of strategically important cities in Tanzania. Urban management will be strengthened by leveraging ICT to enforce implementation of land use plans and increase own source revenue collection, using performance-based service management contracts operations and maintenance to improve service provision, in solid waste management, sanitation, and drainage. Strengthening urban management functions will require local governments taking on increasing responsibilities for the coordination of planning, implementation of plans, and operations and maintenance; and the national government providing policy and regulatory frameworks, supervision, monitoring, and enforcement. The project will implement basic infrastructure and services in participating urban local government authorities (LGAs) and improve the capacities of these local government institutions to plan, implement and maintain infrastructure and services in the longer term. There will be 45 local government authorities that will participate in the program. This includes those from the previous TSCP (8) and ULGSP (18) along with the inclusion of 19 new entities. All LGAs will receive institutional strengthening support under Component 1 and will be eligible for grants for infrastructure subprojects under Component 2. Subprojects may include urban roads, bus stands, markets, drainage, industrial cluster upgrades, public spaces and solid waste management, among others. Resources under Component 2 will be allocated according to LGA population, for which participating LGAs will be divided into three Tiers. The first, Tier 1 cities, consist of those with projected population of above 250,000 people by 2022 (next census) and population growth rates of above 15% percent. Tier 2 and Tier 3 cities will follow in subproject finalization and implementation. This approach ensures that infrastructure investments support the largest and fastest growing secondary cities in Tanzania while technical assistance activities continue to support other local authorities. Capacity of municipal governments to manage environmental and social issues will be considered in the selection process and technically supported as needed for selected municipalities. |
Original sector | FY17 - Public Administration,FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Tanzania |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Road, Water Supply and Storage, Manufacturing (Industrial), Biomass, Commercial, Waste Processing and Treatment, Government, Residential |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Road projects in Tanzania
- Open for FDI through a minority stake/Development of a new project/Processing and preserving of fish and fish products/BLUE PROCESSING COMPANY .LTD
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of made-up textile articles, except apparel/GSM FOAM CO LTD
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of plastics products/Jafnob Printing and Packaging Ltd
- Open for FDI through a minority stake/Purchase of new machinery and equipment/Manufacture of basic iron and steel/Quaim Steel Mills Ltd
- Open for FDI through a minority stake/Establishment of an additional production facility/Manufacture of articles of concrete, cement and plaster/Lake Group (Premix)
- Open for FDI through a majority stake/Purchase of new machinery and equipment/Manufacture of machinery for food, beverage and tobacco processing/Tall Welding & Fabrications
- Dar es Salaam Water Distribution
- Kahama Mining Corp. Ltd.
