logo

Tanzania Data Network (DATEL)

Sector: Manufacturing (Industrial) • Location: Tanzania

Source: International Finance Corporation (IFC)

Project
Completed

Environmental Review Summary (ERS)Project Name Tanzania-DatelRegion Sub-Saharan AfricaSector TelecommunicationsProject No. 007894 1. This project involves the establishment of a national data communication network based on the VSAT technology (Very Small Aperture Terminal). The network will primarily serve various financial, business, educational and governmental institutions

Project Information FAQ

Project Information

3 Q
The project “Tanzania Data Network (DATEL)” is an infrastructure initiative in the Manufacturing (Industrial) sector, located in Tanzania. Taiyo aggregates data on it from International Finance Corporation (IFC).

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

completed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Environmental Review Summary (ERS)Project Name Tanzania-DatelRegion Sub-Saharan AfricaSector TelecommunicationsProject No. 007894 1. This project involves the establishment of a national data communication network based on the VSAT technology (Very Small Aperture Terminal). The network will primarily serve various financial, business, educational and governmental institutions. Total VSAT demand is estimated at 300. Total project cost is estimated at US$10 million of which IFC will provide US$2.76 million in total financing.2. This is a category B project according to IFC’s environmental review procedure because specific impacts may result which can be avoided or mitigated by adhering to generally recognized performance standards, guidelines or design criteria. The review of this project consisted of the appraisal of technical and environmental information submitted by the project sponsor and completed by IFC’s Environment Department staff. The following potential environmental, health and safety impacts of the project were analyzed:· subscriber line right-of-way alignment;· antenna tower site selection;· solid and liquid waste disposal;· PCBs;· fire prevention; and· general employee safety and training.The sponsor has presented plans to address these issues and demonstrate that the proposed project will comply with applicable governmental and World Bank requirements. The information provided about how these potential impacts are addressed in the development of the project is summarized in the paragraphs that follow.3. The VSAT dish and mount will be installed at 10 feet high on the customer premises (roof or compound). Thus, eliminating any possibility of right-of-way alignment issues.4. There is no concern of generation of industrial solid wastes during the first years of operation since new equipment will be used. The life span for the electronic parts is approximately 5 years and for the mechanical parts is almost 10 years. However, if any industrial waste were generated, the sponsor will follow the local requirements for the proper disposal of these wastes. The domestic solid wastes generated will be disposed through the local utility system. 5. Every remote VSAT will be powered by the customer themselves. No PCB transformer or equivalent equipment will be used by Datel.6. The project includes the installation of automatic fire detection system with local alarm during working hours plus remote alarms through telephone to responsible homes at off-hours. Extinguishers in the technical rooms, offices and hallways will be also installed.7. The employees are trained about general safety issues and the sponsor follows the local requirements about health issues.8. Based on its review of available information regarding potential environmental impacts and proposed mitigation measures, IFC concludes that the proposed project is being designed to meet Government of Tanzania requirements, and World Bank policies, and environmental, health and safety guidelines.9. IFC will monitor Datel’s compliance with World Bank policies and guidelines during the life of the project by evaluating environmental performance reports submitted annually to IFC by the sponsor coinciding with the anniversary of the signing of the investment agreement and by conducting periodic site reviews during project supervision.L:\CIND3\TANZAN\DATEL\ERS.DOCMarch 19, 1997 5:55 PM

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data