logo
ProjectPipeline

Tanzania: Uganda-Tanzania Interconnector Project

Pipeline · Tanzania

Source: World Bank Group

The Project will mainly comprise construction of a 400 kV double-circuit transmission line (approximately 550 km within Tanzania) and associated substations, strengthening Tanzania’s grid and supporting regional interconnections. The proposed project supports the implementation of a priority connection in the East Africa region and creates conditions for grid expansion in an access-deficit country

Status
Prospective
Sector
Solar, Power Generation (CCGT), Wind, Warehouse, Hydro, Government, Commercial
Location
Tanzania
Updated
19 Nov 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Tanzania: Uganda-Tanzania Interconnector Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Tanzania: Uganda-Tanzania Interconnector Project” is an infrastructure initiative in the Solar sector, located in Tanzania. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

pipeline

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

The Project will mainly comprise construction of a 400 kV double-circuit transmission line (approximately 550 km within Tanzania) and associated substations, strengthening Tanzania’s grid and supporting regional interconnections. The proposed project supports the implementation of a priority connection in the East Africa region and creates conditions for grid expansion in an access-deficit country. It forms an integral part of the East Africa Power Pool (EAPP) backbone transmission grid, while enhancing the reliability of power interchanges with the Southern African Power Pool (SAPP). The project further contributes to interconnections among Nile Equatorial Lakes (NEL) countries. Overall, it supports the objectives of the regional power pools (SAPP and EAPP) to optimize energy flows, maximize economic trading, increase supply security, and reduce both carbon emissions and electricity costs. The proposed transmission line will help regional countries realize benefits from increased electricity access, shared natural resources, more affordable electricity prices, and improved system reliability through shared support across borders.The Project will comprise the following: (a) Construction of approximately 550 km of 400 kV double-circuit transmission line and associated substations at Kyaka, Nyakanazi, and Ibadakuli. (b) Environment and Social Mitigation, supporting implementation of environmental and social risk mitigation measures, including the Environmental Management Plan (EMP) with biodiversity offsets, the Resettlement Action Plan (RAP), and the Livelihood Restoration Action Plan (LRAP). (c) Project Implementation Support and Institutional Enhancement. This component will support project implementation including the detailed line design, contractor procurement, and implementation supervision. This component will also support project to enhance the institutional capacities of TANESCO, including readiness for operation of the integrated transmission systems and power trade. The capacity building will include activities on climate mitigation and adaptation as well as on the gender action plan to strategically create a system to attract, hire, promote, and retain female talent in the energy sector.

Original sector

Energy and Mineral Resources,Social Protection

Location

Country

Tanzania

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Solar, Power Generation (CCGT), Wind, Warehouse, Hydro, Government, Commercial

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project