The Project will mainly comprise construction of a 400 kV double-circuit transmission line (approximately 550 km within Tanzania) and associated substations, strengthening Tanzania’s grid and supporting regional interconnections. The proposed project supports the implementation of a priority connection in the East Africa region and creates conditions for grid expansion in an access-deficit country

Project Information FAQ

Project Information

4 Q
The project “Tanzania: Uganda-Tanzania Interconnector Project” is an infrastructure initiative in the Solar sector, located in Tanzania. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

pipeline

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Project will mainly comprise construction of a 400 kV double-circuit transmission line (approximately 550 km within Tanzania) and associated substations, strengthening Tanzania’s grid and supporting regional interconnections. The proposed project supports the implementation of a priority connection in the East Africa region and creates conditions for grid expansion in an access-deficit country. It forms an integral part of the East Africa Power Pool (EAPP) backbone transmission grid, while enhancing the reliability of power interchanges with the Southern African Power Pool (SAPP). The project further contributes to interconnections among Nile Equatorial Lakes (NEL) countries. Overall, it supports the objectives of the regional power pools (SAPP and EAPP) to optimize energy flows, maximize economic trading, increase supply security, and reduce both carbon emissions and electricity costs. The proposed transmission line will help regional countries realize benefits from increased electricity access, shared natural resources, more affordable electricity prices, and improved system reliability through shared support across borders.The Project will comprise the following: (a) Construction of approximately 550 km of 400 kV double-circuit transmission line and associated substations at Kyaka, Nyakanazi, and Ibadakuli. (b) Environment and Social Mitigation, supporting implementation of environmental and social risk mitigation measures, including the Environmental Management Plan (EMP) with biodiversity offsets, the Resettlement Action Plan (RAP), and the Livelihood Restoration Action Plan (LRAP). (c) Project Implementation Support and Institutional Enhancement. This component will support project implementation including the detailed line design, contractor procurement, and implementation supervision. This component will also support project to enhance the institutional capacities of TANESCO, including readiness for operation of the integrated transmission systems and power trade. The capacity building will include activities on climate mitigation and adaptation as well as on the gender action plan to strategically create a system to attract, hire, promote, and retain female talent in the energy sector.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data