logo

Tanzania-Zambia Transmission Interconnector

Sector: Road • Location: Tanzania

Source: World Bank Group

Project
Active

The development objective of the Transmission Interconnector Project for Tanzania is to (i) increase power transmission capacity to southern regions of Tanzania and (ii) strengthen institutional capacity in Tanzania and of the Eastern Africa Power Pool for regional power trade. This project has four component. First component, transmission infrastructure extension includes construction of approxim

Project Information FAQ

Project Information

5 Q
The project “Tanzania-Zambia Transmission Interconnector” is an infrastructure initiative in the Road sector, located in Tanzania. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The development objective of the Transmission Interconnector Project for Tanzania is to (i) increase power transmission capacity to southern regions of Tanzania and (ii) strengthen institutional capacity in Tanzania and of the Eastern Africa Power Pool for regional power trade. This project has four component. First component, transmission infrastructure extension includes construction of approximately 620 km of 400 kV double circuit transmission lines, starting in Iringa through Kisada and Mbeya to Tunduma and continuing from Tunduma to Sumbawanga to link the Tanzanian North-West Grid to the interconnector with Zambia. This component cover the electrical and civil works, switchgear, control-protection-communication, supervisory control and data acquisition (SCADA), and auxiliary system equipment along the entire transmission route and in all substations, including required spares for transmission lines and substations. Second component, Tanzania Electric Supply Company Limited (TANESCO) transmission system readiness for interconnection and corporate commercial management improvements includes (i) a technical assessment of TANESCO’s transmission system to identify the operational, planning, and technical gaps in meeting the requirements for operational integration in the Southern African Power Pool (SAPP) and the Eastern Africa Power Pool (EAPP) to comply with the requirements for power system stability, operational ancillary enabling services, frequency synchronization, tie-line control, protection, metering, and other technical standards, and (ii) procurement and installation of necessary additional equipment and reinforcements of the generation/transmission system infrastructure to ensure that the Tanzanian grid meets all operating requirements of the interconnected networks, can synchronize with the EAPP and SAPP systems, and can engage reliably and efficiently in power trade with Zambia and Kenya and in the SAPP and EAPP markets. This component will support the integration of business systems as part of the Corporate Management System. Third component, project implementation support and capacity building will support supervision and management of Component 1 by an owner’s engineer and build TANESCO’s technical, operational, and market trading capacity to participate in regional power trade. Fourth component, technical assistance to EAPP will provide institutional strengthening and capacity building to the EAPP to establish market operating rules and platforms and set up technical requirements for operation of the EAPP member utilities (including TANESCO) in a synchronized fashion. This component financing will cover (a) institutional strengthening and capacity building to EAPP to ensure synchronized operation of grids in the power pool and for Project management; (b) support for the operationalization of centralized short-term markets to complement long-term bilateral contracts; (c) strengthening EAPP’s Independent Regulatory Board (IRB) and capacity building and knowledge sharing among the region’s regulatory boards, and (d) the establishment of a regional technical assistance facility for feasibility studies and capacity building and knowledge sharing between the region’s utilities.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data