TAPANTI POWER
Sector: Power Generation (CCGT) • Location: Costa Rica
Source: World Bank Group
The proposed power project consists of (a) the construction of a 14.5 km tunnel and the addition of 60 MW at the Rio Macho hydroelectric plant which would also be extended to accommodate additional units; (b) installation of spillway gates at the Cachi hydroelectric plant; and (c) construction of associated transmission facilities. The telecommunications project is part of ICE's second stage telec
- Status
- Closed
- Sector
- Power Generation (CCGT), Tunnel, Government, Hydro
- Location
- Costa Rica
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about TAPANTI POWER
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The proposed power project consists of (a) the construction of a 14.5 km tunnel and the addition of 60 MW at the Rio Macho hydroelectric plant which would also be extended to accommodate additional units; (b) installation of spillway gates at the Cachi hydroelectric plant; and (c) construction of associated transmission facilities. The telecommunications project is part of ICE's second stage telecommunications program (1967-1973). It consists of new automatic exchange equipment for 22,500 telephone lines, cable and line networks, telex network and expansion of long-distance facilities to be completed over the four-year period from 1969 through 1973. The purposes of this loan is to assist in financing expansion of power facilities, and to assist in financing expansion of telephone and telex facilities. The proposed power project consists of: (a) the construction of a 14.5 Km. tunnel and the addition of 60 MW at the Rio Macho hydroelectric plant which would also be extended to accommodate additional units; (b) installation of spillway gates at the Cachi hydroelectric plant, and (c) construction of associated transmission facilities. The telecommunications project is part of ICE's second stage telecommunications program (1967-1973). It consists of new automatic exchange equipment for 22,500 telephone lines, cable and line networks, telex networks and expansion of long-distance facilities to be completed over the four-year period from 1969 through 1973. The total estimated cost, including interest during construction, of the proposed power project is $25.7 million equivalent and of the telecommunications project $9.5 million equivalent. |
Original sector | (Historic)Electric Power & Other Energy |
Location
Country | Costa Rica |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Tunnel, Government, Hydro |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
