logo

TAPANTI POWER

Sector: Power Generation (CCGT) • Location: Costa Rica

Source: World Bank Group

Project
Closed

The proposed power project consists of (a) the construction of a 14.5 km tunnel and the addition of 60 MW at the Rio Macho hydroelectric plant which would also be extended to accommodate additional units; (b) installation of spillway gates at the Cachi hydroelectric plant; and (c) construction of associated transmission facilities. The telecommunications project is part of ICE's second stage telec

Status
Closed
Sector
Power Generation (CCGT), Tunnel, Government, Hydro
Location
Costa Rica
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about TAPANTI POWER

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “TAPANTI POWER” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Costa Rica. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The proposed power project consists of (a) the construction of a 14.5 km tunnel and the addition of 60 MW at the Rio Macho hydroelectric plant which would also be extended to accommodate additional units; (b) installation of spillway gates at the Cachi hydroelectric plant; and (c) construction of associated transmission facilities. The telecommunications project is part of ICE's second stage telecommunications program (1967-1973). It consists of new automatic exchange equipment for 22,500 telephone lines, cable and line networks, telex network and expansion of long-distance facilities to be completed over the four-year period from 1969 through 1973. The purposes of this loan is to assist in financing expansion of power facilities, and to assist in financing expansion of telephone and telex facilities. The proposed power project consists of: (a) the construction of a 14.5 Km. tunnel and the addition of 60 MW at the Rio Macho hydroelectric plant which would also be extended to accommodate additional units; (b) installation of spillway gates at the Cachi hydroelectric plant, and (c) construction of associated transmission facilities. The telecommunications project is part of ICE's second stage telecommunications program (1967-1973). It consists of new automatic exchange equipment for 22,500 telephone lines, cable and line networks, telex networks and expansion of long-distance facilities to be completed over the four-year period from 1969 through 1973. The total estimated cost, including interest during construction, of the proposed power project is $25.7 million equivalent and of the telecommunications project $9.5 million equivalent.

Original sector

(Historic)Electric Power & Other Energy

Location

Country

Costa Rica

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Tunnel, Government, Hydro

Article published date

2025-12-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project