Taqa Arabia Solar
The status, timeline and source of this project. A free account opens every field.
Source: International Finance Corporation (IFC)
The project is a greenfield 50 MWac photovoltaic (PV) plant being developed by TAQA Arabia S.A.E. (the Sponsor) as part of Round 2 of the Egyptian Government feed-in-tariff (FiT) scheme for domestic solar PV and wind energy projects. TAQA Arabia is currently owned by Qalaa Holdings (previously known as Citadel Capital) which IFC has existing investments with. This sponsor will own the project comp
- Status
- Prospective
- Sector
- Warehouse, Energy Storage, Power Transmission, Wind, Solar, Government, Power Generation (CCGT), Oil and Gas, Road
- Location
- Egypt
- Updated
- 19 Nov 2026
- Source
- International Finance Corporation (IFC)
ConstructChat
Ask ConstructChat about Taqa Arabia Solar
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | active |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project is a greenfield 50 MWac photovoltaic (PV) plant being developed by TAQA Arabia S.A.E. (the Sponsor) as part of Round 2 of the Egyptian Government feed-in-tariff (FiT) scheme for domestic solar PV and wind energy projects. TAQA Arabia is currently owned by Qalaa Holdings (previously known as Citadel Capital) which IFC has existing investments with. This sponsor will own the project company “TAQA Arabia for Solar Energy S.A.E.” (TAS), and has selected Sterling & Wilson as the Engineering, Procurement, and Construction (EPC) and Operations and Maintenance (O&M) contractor. |
Original sector | V-BF - Solar - Renewable Energy Generation |
Budget |
Location
Country | Egypt |
Source
Source | International Finance Corporation (IFC) |
URL |
More Details
Record type | Project |
Sector | Warehouse, Energy Storage, Power Transmission, Wind, Solar, Government, Power Generation (CCGT), Oil and Gas, Road |
Article published date | 2025-08-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
