Tara Battery Energy Storage System (Tara BESS)
Sector: Energy Storage • Location: Arran-Elderslie, Ontario, Canada
Source: CK News Today
A proposed 400-megawatt, 1,600-megawatt-per-hour battery energy storage system intended to support the provincial electricity grid by enhancing reliability and integrating renewable energy. The project site is located at Concession 4 in the former Arran Township and lies within a regulated floodplain requiring substantial alteration and amendments to local plans.
- Status
- Closed
- Sector
- Energy Storage, Power Generation (CCGT)
- Location
- Arran-Elderslie, Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- CK News Today
ConstructChat
Ask ConstructChat about Tara Battery Energy Storage System (Tara BESS)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | cancelled |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | A proposed 400-megawatt, 1,600-megawatt-per-hour battery energy storage system intended to support the provincial electricity grid by enhancing reliability and integrating renewable energy. The project site is located at Concession 4 in the former Arran Township and lies within a regulated floodplain requiring substantial alteration and amendments to local plans. |
Original sector | Energy |
Procurement method |
Location
Country | Canada |
State | Ontario |
City | Arran-Elderslie |
Source
Source | CK News Today |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT) |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Canada
- Transition to Zero-Emission Buses
- Fundy Trail Development Authority Inc.Hearst Lodge solar power and battery storage energy conversion
- Conventional Vehicle Replacement
- North West Redwater Sturgeon Bitumen Refinery, Alberta
- Canyon Creek Pumped Hydro Energy Storage Project
- Electric Vehicle Battery Cell Plant (Volkswagen Group)
- Hybrid Buses Rehabilitation
- Aura Peace Butte Solar
