Tarali Project
One of 10,000+ projects Taiyo tracks in Maharashtra.
Source: India Investment Grid (IIG)
Information Department of water resources-MH - II has come up with Tarali Project with a ticket size of 943.26 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 20
- Status
- Closed
- Sector
- Cement, Hydro, Water Supply and Storage, Road, Government
- Location
- Dangishtewadi, Maharashtra, India
- Updated
- 22 Jul 2026
- Source
- India Investment Grid (IIG)
ConstructChat
Ask ConstructChat about Tarali Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Information Department of water resources-MH - II has come up with Tarali Project with a ticket size of 943.26 INR Crores. This project in Irrigation sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project The project is included under Centrally Sponsored Scheme, PMKSY-AIBP and prioritized in 2016 for early completion. Project envisages construction of the following main works [i] 1096 m long Masonry Dam with maximum height of 73.41 m above foundation level. [ii] 10 K.T weirs downstream of dam, 7 localised lift irrigation schemes [ upto 50m. head] to provide annual irrigation to an area 7560 ha. [iii] Koparde Lift Scheme for lifting water from Krishna river to km. 79 of Arphal Left bank Canal. During inclusion of Project under PMKSY-AIBP in 2016 Balance Cost of the Project was Rs 496.34 crore Eligible Central Assistance was Rs 80.54 crore CA released since 2016 till October 2021- 57.74 crore State Share released through NABARD under LTIF till October 2021- Rs 378.85 crore Physical progress- 71.82 percentage Financial Progress- 94.5 percentage Ultimate Irrigation Potential is 19498 Ha Irrigation Potential created till June 2023- 17321 Ha Projected Date of Completion- December 2024 |
Original sector | Water Resources |
Procurement method | |
Budget |
Location
Country | India |
State | Maharashtra |
City | Dangishtewadi |
Source
Source | India Investment Grid (IIG) |
URL |
More Details
Record type | Project |
Sector | Cement, Hydro, Water Supply and Storage, Road, Government |
Article published date | 2024-02-26 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in India
- Kiru Hydroelectric Project Jammu and Kashmir India
- Pinnapuram Integrated Renewable Energy Project India
- Chuzachen Hydroelectric Power Project Sikkim
- Rampur Hydro Electric Power Project Himachal Pradesh
- UriII Hydroelectric Project Jammu and Kashmir
- Kakrapar Atomic Power Station Expansion
- Luhri StageI Hydroelectric Project Himachal Pradesh India
- Lower Subansiri Hydroelectric Power Project
