logo
ProjectPassed Final Review, Pending Approval

Taraz WWTP Modernisation

The status, timeline and source of this project. A free account opens every field.

Source: European Bank for Reconstruction and Development (EBRD)

Provision of a sovereign-guaranteed loan of up to KZT 41.3 billion (equivalent EUR 76.2 million) (the “Loan”) for the benefit of the State Communal Enterprise (SCE) "Zhambyl Su" (the “Company”), a municipal company owned by Akimat of Taraz City providing water supply and sewage services in Taraz City (the “City”), for major modernisation of the wastewater treatment plant (“WWTP”) and associated in

Status
Prospective
Sector
Road, Water Supply and Storage, Government, Power Generation (CCGT), Residential, Waste Processing and Treatment, Commercial
Location
Kazakhstan
Updated
19 Nov 2026
Source
European Bank for Reconstruction and Development (EBRD)

ConstructChat

Ask ConstructChat about Taraz WWTP Modernisation

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Taraz WWTP Modernisation” is an infrastructure initiative in the Road sector, located in Kazakhstan. Taiyo aggregates data on it from European Bank for Reconstruction and Development (EBRD).

Participants

Sponsoring Agency

Status

Original status

passed final review, pending approval

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Provision of a sovereign-guaranteed loan of up to KZT 41.3 billion (equivalent EUR 76.2 million) (the “Loan”) for the benefit of the State Communal Enterprise (SCE) "Zhambyl Su" (the “Company”), a municipal company owned by Akimat of Taraz City providing water supply and sewage services in Taraz City (the “City”), for major modernisation of the wastewater treatment plant (“WWTP”) and associated infrastructure (the “Project”). The Loan will be used to finance the Project’s Priority Investment Programme (the “PIP”) that involves construction of a new WWTP with the capacity of 80,000 m3/day (over 300,000 population equivalent (P.E.)) to meet both national and EU requirements for urban wastewater treatment and sewage sludge. The wider project scope also includes remediation of the existing filtration lagoons, reconstruction of the wastewater pumping station and external electricity supply to the WWTP that will be financed from the local budget through a government funding. Once implemented, the Project will also lead to reducing local pollution and odour. The following documents are available in English, Kazakh and Russian for this project: 1. Environmental and Social Impact Assessment (“ESIA”), including Environmental and Social Management Plan (“ESMP”); 2. Non-Technical Summary (“NTS”); 3. Stakeholder Engagement Plan (“SEP”); 4. Resettlement Framework (“RF”); 5. Environmental and Social Action Plan (“ESAP”). Download ZIP file of ESIA package in English Download ZIP file of ESIA package in Kazakh Download ZIP file of ESIA package in Russian Post-disclosure Public Consultation Report (PCR) January 2025 Full ESIA documentation is available locally at: 1) SCE Zhambyl Su, 136 Kazybek Bi, Taraz city, Zhambyl province, Kazakhstan; 2) EBRD Resident Office in Almaty, 41 Kazybek Bi street, Park Palace Business Centre, 3-rd Entrance, 3-rd Floor, 050010, Almaty, Kazakhstan and Client website https://tarazsu.kz/2024/06/14/ovos - RUS https://tarazsu.kz/kz/2024/06/14/ovos - KAZ https://tarazsu.kz/en/2024/06/14/ovos - ENG Environmental or social enquiries Mr. Daulet Dospanbetov, Engineer, Member of Project Implementation Unit, SCE Zhambyl Su Tel.: +7 700 170 0013 E-mail: daulet-enu@list.ru General enquiries SCE Zhambyl Su, 136 Kazybek Bi, Taraz city, Zhambyl province, Kazakhstan Tel.: +7 7262 45 35 37 E-mail: taraz-su@mail.ru Website: https://tarazsu.kz/

Original sector

Municipal Infrastructure

Budget

Location

Country

Kazakhstan

Source

Source

European Bank for Reconstruction and Development (EBRD)

URL

More Details

Record type

Project

Sector

Road, Water Supply and Storage, Government, Power Generation (CCGT), Residential, Waste Processing and Treatment, Commercial

Article published date

2025-07-22

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project