logo

TARBET THERMAL POWER

Sector: Power Generation (CCGT) • Location: Ireland

Source: World Bank Group

Project
Closed

The Second Power Project consists of a 250 MW extension to the Tarbert generating station which is situated at the mouth of the Shannon River in Western Ireland. A single oil-fired generating unit would be connected to the main 220 KV grid system by a 65 km transmission line. ESB has considerable experience in designing and supervising the construction of large thermal stations and is able to perf

Project Information FAQ

Project Information

5 Q
The project “TARBET THERMAL POWER” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ireland. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Second Power Project consists of a 250 MW extension to the Tarbert generating station which is situated at the mouth of the Shannon River in Western Ireland. A single oil-fired generating unit would be connected to the main 220 KV grid system by a 65 km transmission line. ESB has considerable experience in designing and supervising the construction of large thermal stations and is able to perform these functions without the assistance of consultants. The project is technically sound and represents the least-cost solution of a number of alternative sites considered. The internal financial rate of return on the investment for the project would be 28 percent. This comparatively high rate of return reflects the low investment cost per KW of the new oil-fired facility and its higher efficiency as compared to the existing thermal capacity.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data