Targa Resources - Office Renovation
One of 10,000+ projects Taiyo tracks in Texas.
Source: Dodge USA
Interior Renovation of an 28,709 SF office on level 16 of Existing Type 1A Office Tower. Scope includes selective demolition of existing partitions and design of new partitions, ceilings, lights, finishes, millwork, mechanical, electrical, plumbing.
- Status
- Closed
- Sector
- Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial)
- Location
- Houston, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Targa Resources - Office Renovation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Construction Documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Interior Renovation of an 28,709 SF office on level 16 of Existing Type 1A Office Tower. Scope includes selective demolition of existing partitions and design of new partitions, ceilings, lights, finishes, millwork, mechanical, electrical, plumbing. |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Houston |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial) |
Article published date | 2024-12-02 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
