Target Distribution Center Building Alteration
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The Project Consists Of New Call Box At The Vehicular Entrance, Card Reader And Pedestrian Entrance Gate/ Turnstile At The Main Entrance And New Card Readers At Vehicle Ramps At Two Existing over Head Doors Of The Target Distribution Center Located In Newton, North Carolina. There are No Modifications To The Existing Building Envelope. Interior Work Consists Of Electrical Tie-In work Needed To Pow
- Status
- Prospective
- Sector
- Power Generation (CCGT), Automotive, Commercial, Manufacturing (Industrial), Residential
- Location
- Newton, North Carolina, United States of America
- Updated
- 19 Nov 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Target Distribution Center Building Alteration
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | start |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The Project Consists Of New Call Box At The Vehicular Entrance, Card Reader And Pedestrian Entrance Gate/ Turnstile At The Main Entrance And New Card Readers At Vehicle Ramps At Two Existing over Head Doors Of The Target Distribution Center Located In Newton, North Carolina. There are No Modifications To The Existing Building Envelope. Interior Work Consists Of Electrical Tie-In work Needed To Power The Call Box And Card Readers. |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Newton |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Automotive, Commercial, Manufacturing (Industrial), Residential |
Article published date | 2025-08-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- SR 77 @ FALLING CREEK 6.1 MI S OF ELBERTON
- VALDOSTA - AIRFIELD ELECTRICAL IMPROVEMENTS
- CR 423/MOUNT OLIVE ROAD @ SANDY CREEK NW OF DUBLIN
- DISTWIDE STUDY REMOVAL/RELOCATION OF UTILITY POLES DIST 3
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
- 98th avenue se (97th place se) and se 11th street slope stabilization
