Targeting Centre Mixed-Use Development
Planning schematics · Connecticut · Last reported Mar 2025
Source: Dodge
4 New and renovation of 3 existing (141,263 sf total existing) buildings - Mixed use development, in 3 phases, with 201 apartments (two new 4-story bldgs and renovate two existing 3-story bldgs), a new 9200 sf retail/restaurant building and a new 2400 sf Starbucks
- Status
- Prospective
- Sector
- Consumer Products, Residential, Manufacturing (Industrial), Commercial
- Location
- Windsor, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Targeting Centre Mixed-Use Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 4 New and renovation of 3 existing (141,263 sf total existing) buildings - Mixed use development, in 3 phases, with 201 apartments (two new 4-story bldgs and renovate two existing 3-story bldgs), a new 9200 sf retail/restaurant building and a new 2400 sf Starbucks |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Windsor |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Residential, Manufacturing (Industrial), Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- 98th avenue se (97th place se) and se 11th street slope stabilization
- REMOVE AND REPLACE FENCE, INSTALL ANTENNAS, POWER TRUNKS, RECTIFIERS, BREAKER AND BATTERY STRINGS
- CONVERT (E) DETACHED PERMITTED WORKSHOP INTO NEW ADU, INSTALL (N) FURNACE & TANKLESS W.H,RELOCATE (E)100A SUBPANEL
- WMATA Orange and Blue Line Rehabilitation
- Lake Nona Middle School
- Armature Works
- Anaheim Regional Transportation Intermodal Center
