TARIM BASIN II PROJECT
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The Second Tarim Basin Project aims at a) increasing incomes of poor farmers through irrigated agriculture development; b) establishing mechanisms for sustainable use, development, and management of water resources and land in Tarim Basin; and c) partially restoring and preserving the "green corridor" in the lower reaches of the Tarim River. There are eight project components. First, water conse
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Hydro, Raw Materials, Government
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about TARIM BASIN II PROJECT
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Second Tarim Basin Project aims at a) increasing incomes of poor farmers through irrigated agriculture development; b) establishing mechanisms for sustainable use, development, and management of water resources and land in Tarim Basin; and c) partially restoring and preserving the "green corridor" in the lower reaches of the Tarim River. There are eight project components. First, water conservancy measures include irrigation and drainage system rehabilitation and improvements, hydropower stations, and transmission lines. Second, land reclamation will cover non-productive lands with a total area of 75,350 hectares. Third, land improvement will cover low-yield irrigated lands with a total area of 105,350 hectares. Fourth, agricultural support services will support on-farm development in terms of seed availability, machinery services, technology transfer, etc. Fifth, environmental protection and monitoring will improve quality and quantity of ground and surface water. Sixth, institutional development support will strengthen prefecture and county Project Management Offices (PMOs), self-financing irrigation and drainage districts, and line agencies. Seventh, Tarim Basin Water Resources Commission support will finance institutional development support and measures on mainstream of the Tarim River to improve water management and water delivery to the lower reaches of the river. Eighth, regional management will support the Regional PMO and training facilities. |
Original sector | FY17 - Agriculture, Fishing and Forestry,FY17 - Public Administration |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Hydro, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Yangjiang Nuclear Power Plant Guangdong Province
- Shidao Bay Nuclear Power Plant
- Sanmen Nuclear Power Plant Zhejiang Province
- Baihetan Hydropower Project China
- The Ertan China Hydropower Plant Project
- Yebatan Hydropower Project
- Qinshan Nuclear Power Plant Haiyan County Zhejiang
- Lingao Nuclear Power Station Guangdong
