TARIM BASIN IRRIGATI
Sector: Water Supply and Storage • Location: China
Source: World Bank Group
The Tarim Basin Project will alleviate poverty in several of the poorest counties with a predominant minority population in Xinjiang Region by increasing crop and livestock production and productivity. The project will: (i) rehabilitate and upgrade irrigation and drainage facilities in Yerqiang and Weigan oases through construction of canal lining, drainage canals, diversion structures, tubewells
- Status
- Closed
- Sector
- Water Supply and Storage, Fertilizers, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Forest Products and Packaging, Consumer Products, Raw Materials, Government
- Location
- China
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about TARIM BASIN IRRIGATI
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Tarim Basin Project will alleviate poverty in several of the poorest counties with a predominant minority population in Xinjiang Region by increasing crop and livestock production and productivity. The project will: (i) rehabilitate and upgrade irrigation and drainage facilities in Yerqiang and Weigan oases through construction of canal lining, drainage canals, diversion structures, tubewells and onfarm works for low yielding land and reclaimed areas of desert wasteland; (ii) construct a small hydro-power station on the Yerqiang River and inter-connecting transmission grid to expand the electrical generating and transmission capacities; (iii) finance the improvement and expansion of the agricultural extension system at county and township levels; seed processing, distribution and multiplication systems; farm mechanization centers; hail suppression system, and research in cotton; (iv) finance the expansion of livestock services in breed improvement, veterinary and feed development services, improved research and training and development of mixed crop/livestock farms; and (v) finance an ecosystem restoration component designed to recover some of the natural forest along the Tarim River which boarders the Taklimakan desert to prevent expansion of the desert. |
Original sector | Energy and Extractives,FY17 - Agriculture, Fishing and Forestry |
Budget |
Location
Country | China |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Fertilizers, Power Generation (CCGT), Waste Processing and Treatment, Hydro, Forest Products and Packaging, Consumer Products, Raw Materials, Government |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in China
- Three Gorges Dam Hydro Electric Power Plant China
- Taishan Nuclear Power Plant
- Tianwan Nuclear Power Plant Lianyungang
- Zhenan PumpedStorage Power Project
- Xiluodu Hydroelectric Power Plant
- Hynix China Project Clean Room Package
- Yichun Economic Development Zone Sewage Comprehensive Treatment Plant
- Baoying Waste-to-Energy plant
