Tashkent Solid Waste Management Project
The status, timeline and source of this project. A free account opens every field.
Source: World Bank Group
The objectives of the Tashkent Solid Waste Management Project are to: (a) return the existing Municipal Solid Waste Management System (MSWM) collection and disposal system to a satisfactory level of service; and (b) improve the technical, financial and institutional basis for its future operation and development. The investment components include: (a) the purchase of collection vehicles and suppo
- Status
- Closed
- Sector
- Water Supply and Storage, Power Transmission, Automotive, Biomass, Manufacturing (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Government, Education
- Location
- Uzbekistan
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Tashkent Solid Waste Management Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The objectives of the Tashkent Solid Waste Management Project are to: (a) return the existing Municipal Solid Waste Management System (MSWM) collection and disposal system to a satisfactory level of service; and (b) improve the technical, financial and institutional basis for its future operation and development. The investment components include: (a) the purchase of collection vehicles and support equipment; (b) the increase in number of collection bins and collection points; (c) landfill modernization; (d) vehicle park development; (e) landfill closure; (f) design, procurement, and construction of four transfer stations; (g) purchase of transfer station vehicles; (h) purchase of biomedical waste facilities; and (i) the purchase of operational computer equipment. The institutional support components include: (a) project management support; (b) a strategic plan; (c) corporatization assistance; (d) financial management system development and implementation; (e) tariff study; (f) collection optimization studies; (g) landfill operations training; (h) landfill closure design and training; (i) landfill expansion design assistance; and (j) public participation and education assistance. |
Original sector | FY17 - Water, Sanitation and Waste Management |
Budget |
Location
Country | Uzbekistan |
Source
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Power Transmission, Automotive, Biomass, Manufacturing (Industrial), Power Generation (CCGT), Waste Processing and Treatment, Government, Education |
Article published date | 2025-12-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in Uzbekistan
- Fergana Refinery Modernisation
- UZBEKISTAN WATER FRAMEWORK LOAN
- Sirdarya CCGT Power Plant Shirin
- Tashkent water improvement contract
- Bukhara & Samarkand water supply project
- Uzbekistan: Surkhandarya 1,560MW CCGT Power Plant
- Uzbekistan: Bukhara Road Network Improvement Project Phase 2
- Uzbekistan: Karakalpakstan and Khorezm Water Supply and Sanitation Project
