TASHKENT SOLID WASTE MANAGEMENT REHABILITATION
Sector: Waste Processing and Treatment • Location: Uzbekistan
Source: European Bank for Reconstruction and Development (EBRD)
The project comprises upgrading the basic infrastructure for municipal and industrial solid waste management in Tashkent, Uzbekistan. The main objective of the project is to restore the basic municipal and industrial waste collection and disposal services. Other objectives are to address urgent environmental problems and public health hazards, and to strenghten the institutional arrangements surro
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | complete |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project comprises upgrading the basic infrastructure for municipal and industrial solid waste management in Tashkent, Uzbekistan. The main objective of the project is to restore the basic municipal and industrial waste collection and disposal services. Other objectives are to address urgent environmental problems and public health hazards, and to strenghten the institutional arrangements surrounding the municipal solid waste management in Tashkent. The project will help promote transition through: The borrower will be the City of Tashkent.The loan will be guaranteed by the Republic of Uzbekistan. The EBRD will provide a sovereign loan of US$ 19.2 million (Euro 16.3 million). The project will be co-financed with the World Bank. US$ 46 million (Euro 39 million). The project was screened B/1. An environmental audit of current operations and an analysis of the project has been carried out by independent consultants. This study indicated that current operations constitute a major environmental and public health risk. Major issues will be addressed by the project. This includes investments in the upgrading of the waste collection system, the rehabilitation and closure of two unsafe landfill sites and the development of a third landfill site. It is expected that implementation of these key project components will result in significant environmental and public health and safety benefits. The project also includes a strategic planning component for the future development of the municipal waste disposal system of Tashkent, which provides an opportunity to bring the entire system in line with international environmental and health and safety standards. Technical cooperation funding will be sought to support project implementation and the institutional strengthening programme for the system operator and the City of Tashkent. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
