The Itezhi-Tezhi hydropower station is a 120 MW facility located in the Itezhi-Tezhi District. The Itezhi-tezhi dam, built as a storage reservoir for the existing Upper Kafue Gorge Hydro (UKGH) Power Station, is located on the Kafue River about 230 km upstream from the existing Station.

The Zambian government granted a 25-year Power purchasing Agreement to the Itezhi-Tezhi Power Corporation (ITP

Project Information FAQ

Project Information

5 Q
The project “TATA Itezhi-Tezhi HPP” is an infrastructure initiative in the Commercial sector, located in Zambia. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Itezhi-Tezhi hydropower station is a 120 MW facility located in the Itezhi-Tezhi District. The Itezhi-tezhi dam, built as a storage reservoir for the existing Upper Kafue Gorge Hydro (UKGH) Power Station, is located on the Kafue River about 230 km upstream from the existing Station. The Zambian government granted a 25-year Power purchasing Agreement to the Itezhi-Tezhi Power Corporation (ITPC), a Joint Venture Company established by the state owned Zambia Electric Supply Corporation (ZESCO) and TATA AFRICA HOLDINGS LIMITED (TATA). ITPC will build, operate and transfer a hydroelectric power plant with 2 x 60 MW at the Itezhi-Tezhi dam. The plant is scheduled to begin commercial operation in 2014. The EPC contract was awarded to Sinohydro on a turnkey basis. The turbine and generator units were supplied by Alstom under a contract worth $26.25 million. The PPA tariff was to be USD 8.51 cents/kWh, under a three-year multi-tariff framework. The US$239.5 million project cost, split between $71.7 million in equity and $167.8 million in debt. The debt will be supported by a US$29.04 million loan from Exim Bank of India agreed in 2010, the remaining $138 million in debt is divided equally between the AfDB (lead bank), PROPARCO, FMO and the Development Bank of Southern Africa (DBSA) in 2011, of $34.57 million each. A Single EPC contract has been signed with Chinese contractor Sinohydro, after a competitive international bidding process. Equity was contributed by TATA ($35.86 million) and ZESCO ($35.86 million). ZESCOs equity was funded via EIB and ADF ($17.8 million each). Project has an IRR of 16.2%. Average operating costs were USD 2.7 cents/kWh, for ZESCO in general. http://www.afdb.org/fileadmin/uploads/afdb/Documents/Project-and-Operations/Zambia%20-%20AR%20-%20Itezhi-Tezhi%20Hydro%20Power%20and%20Transmission%20Line%20Project%20-%20Rev%201.pdf http://clairemchapman.wordpress.com/2011/08/31/kafue-gorge-hydro-power-station-zambia/

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data